装修前期准备(Preliminary preparation)

装修前期准备(Preliminary preparation) The home inspection in nine steps I. wall 1, check whether the wall cracking. 2, check whether the wall hollowing, knocked on the wall with a wooden hammer or other things, hit the drum sound is not real, can easily hear it. Mark it and fill it with putty. 3, check the wall putty, whether it is waterproof putty, you can bring bottles of mineral water, water on the wall, hand to touch, see if there is mud on hand, no, then proved that the wall waterproof putty qualified Two roof 1. Check the roof for cracks. 2, check the roof and wall of yin and Yang corner line