- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
资料员应做(The data clerk should do it)
资料员应做(The data clerk should do it)
Engineering data
First, start preparation information
1. Start work report (B1004) (attached project start report, trial form A1)
2, the enterprise qualification certificate (foreign enterprises entering the city should have registration procedures)
3, the list of project management personnel (B1007) attached to the management post certificate
4. Construction organization design (pre attached construction organization design (programme / change) report form (B1008))
5, construction plan (attached to the construction organization design (program / change) report form A2) attached to the construction program
6, schedule (pre attached construction plan, examination form A10) attached to the construction schedule
The information about the 7 collect and engineering drawings such as records, technical disclosure records, notification of design changes and project records
Two, engineering positioning line (pre attached line release test table A11)
1: planning departments positioning coordinates, elevation control summary (C1201)
2 、 construction line control net record (C1202)
3: construction line acceptance record (C1203)
Foundation cushion and main body line (front attaching and releasing test list A11)
1 、 construction line acceptance record (C1203)
2: multilayer top floor caving survey record (C1204)
3: drawings (line drawing)
Three. Earthwork
1. Earthwork excavation:
The earthwork excavation project quality acceptance batch inspection record (A1001; the attached inspection application form A4)
After excavation, the foundation shall be bored and recorded (C1106)
2, backfill (of inspectionapplication form A4)
Dry density and compaction tests should be done before backfilling, and the optimum moisture content shall be determined
Inspection report on quality acceptance of earthwork backfill project (A1002)
Inspection report of batch quality acceptance for lime soil engineering (A1011)
Field backfill test record of soil and lime soil cush
您可能关注的文档
- 简单磨具设计(Simple abrasive design).doc
- 系统stop 出错代码解说(System stop error code commentary).doc
- 紫外吸收光谱法测定苯甲酸(Determination of benzoic acid by ultraviolet absorption spectrometry).doc
- 红人微博账号资源大全(Micro-blog account resources).doc
- 红屏带回扫线(Red screen back sweep).doc
- 紧固件常用国内外材料分析及应用(Analysis and application of fasteners commonly used at home and abroad).doc
- 红楼梦》中对自然美的追求(The pursuit of natural beauty in a dream of Red Mansions).doc
- 红岩汽车重庆汽车发展亲历者(Hongyan Automobile Chongqing automobile development experience).doc
- 精甲醇中水含量的优化控制(Optimal control of water content in refined methanol).doc
- 红河州创办中小企业工作方案(Working program for small and medium sized enterprises in Honghe Prefecture).doc
- 2025年亚洲供应链重塑:中国企业如何穿越周期报告.pdf
- 传媒行业GenAI之四十三:AI玩具兼具教育陪伴价值,字节AI全线发力(202412).pdf
- 360亿方智能航空AI白皮书 2025-Al重塑航空未来,智能化转型驱动民航高质量发展.pdf
- 2024年中国充电桩及储能设备出口分析及各国进口政策影响白皮书.pdf
- 2024年100个城市消费者满意度测评报告.pdf
- 2024年科技创新政策汇编.pdf
- 当“美国不再例外”遇上“东升西落”(202504).pdf
- 2024年户外运动健身人群洞察报告.pdf
- 2024年启航东盟:出海攻略实用指南报告.pdf
- 2025中国AIGC应用全景图谱.pdf
文档评论(0)