- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
山东省自科学杰出青年基金申报注意事项
山东省自然科学杰出青年基金申报注意事项
(山东省科技计划管理信息系统(试用版)网址:/stdpms/)
已注册账户的老师,原始账户还可以继续使用,不用另行注册。
1、请仔细阅读申请书封面后的“填表说明”,以免形式审查不合格。封面“学科代码采用国家自然科学基金委员会学科代码系统,可登陆国家自然科学基金委网站()查询,按“国家自然基金委学科代码”准确填写。
Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test
Ellipticity of elbow pipes with diameters less than o
您可能关注的文档
最近下载
- GB50003-2011 砌体结构设计规范.doc VIP
- 三年级上册劳动人民版雏菊盆景迎重阳教学设计.docx VIP
- 沪教牛津版英语2024七年级上册全册知识清单(记忆版).pdf
- 2025年电子科技大学附属肿瘤医院·四川省肿瘤医院招聘笔试备考题库及答案解析.docx VIP
- 低空空域风切变灾害预警与飞行安全协同控制体系研究.docx VIP
- 2025至2030中国汽车检测行业发展分析及发展趋势分析与未来投资战略咨询研究报告.docx
- 力士乐样本1-液压泵和马达.pdf VIP
- 儿童,颜色,填涂画.docx VIP
- 第六单元+资本主义制度的初步确立+复习课件+2023--2024学年部编版九年级历史上学期.pptx VIP
- 学堂在线 人工智能原理 章节测试答案.docx VIP
文档评论(0)