中国石油北京《修井工程》第一阶段在线作业(China Petroleum Beijing workover project in the first phase of online operation).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国石油北京《修井工程》第一阶段在线作业(China Petroleum Beijing workover project in the first phase of online operation)
中国石油北京《修井工程》第一阶段在线作业(China Petroleum Beijing workover project in the first phase of online operation)
The first stage of Beijing oil online -- 14 spring 13 spring autumn 13 operation in China University of Petroleum
Single choice
What is the name of the first first questions in the middle and lower layer casing into the well structure?
A, surface casing
B, casing
C, casing
D, catheter
The second wells completed in the most widely used method is what method?
A, open hole completion method
B, liner completion method
C, gravel pack completion method
D, perforation method
Third tree body refers to the device which part?
A, the casing collar part above
B, the sleeve flange part above
C, the total gate above
D, more than four tubing part
The following fourth questions belong to the well itself is the fault?
A, fracture
B, plugging
C, tripping tubing
D, pump leakage
The following fifth questions do not belong to the underground work safety accident classification is a kind of nature?
A, electrical accident
B, blowout accident
C, poisoning
D, fracture
The following sixth questions do not belong to the role of a cement truck is?
A, sand
B, deep well washing
C, wash well
D, to provide emergency solution
Four flange seventh casing screw thread unloading wellhead device, should live wrench choose what size?
A, 300mm? 6mm
B, 350mm? 1mm
C, 250mm? 0mm
D, 450mm? 5mm
The basic structure of eighth packer does not include
A, seal
B, righting
C, four
D, packer
Ninth which of the following equipment belonging to ground rotating equipment?
A, travelling block
B, crane
C, operating vehicle
D, dial
Tenth questions about the K341 - 140 Type openhole packer is an incorrect formulation?
A, for expanding packer
B, the largest diameter of 120mm rigid body
C, no support
D, by the hydraulic seal
Eleventh questions about the Y211 - 114 type packer is a statement is not true?
A, as the compression packer
B, the largest diameter of 114mm rigid body
C, no support
D, put the column setting
Twelfth sin
您可能关注的文档
最近下载
- TB_10307-2020_铁路通信_信号_信息工程施工安全技术规程.docx VIP
- 第一单元写作《热爱写作,学会观察》课件-2025-2026学年七年级语文上册(统编版).pptx
- 牛场饲养部门安全培训.pptx VIP
- 妇产科工作制度与各岗位职责.doc VIP
- 全国旅游地图.pptx VIP
- 2025年全国英语等级考试(PETS)一级试卷:2025年寒假真题解析.docx
- 人美版七年级上册2.1《自然的色彩》课件.pptx
- 商务沟通与谈判全套教学课件.pptx
- 医疗质量与安全管理制度-不良事件管理制度.docx VIP
- IATF16949第三方审核不符合项整改计划(案例).pdf VIP
文档评论(0)