影响工程进度的因素及解决方法(Factors affecting engineering schedule and Solutions).docVIP

影响工程进度的因素及解决方法(Factors affecting engineering schedule and Solutions).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
影响工程进度的因素及解决方法(Factors affecting engineering schedule and Solutions)

影响工程进度的因素及解决方法(Factors affecting engineering schedule and Solutions) Factors affecting the project progress and Solutions Many factors affect the progress of the project. These factors can be summed up as human factors, material factors, technical factors, financial factors, hydrological factors, engineering meteorological factors, environmental factors and social environmental factors and other factors Theres no telling. The influence of human factors is most serious, from the origin point of view, from the developers and the higher authorities; from the design unit; from the contractor (subcontractors) and the higher authorities; from the supplier of materials and equipment; with the supervision units there; from government departments; also from the social and natural conditions. Now these factors are summarized as follows: (the attached project management routine solutions and solutions, because experience is limited, there is no study of relevant information, there are a lot of omissions not forget Tongren solutions to correct and more practical) One factor, from developers 1. survey data is not accurate, especially the technical barrier of geological data errors or omissions caused by the unexpected. (foundation treatment and foundation pit excavation and support may encounter, whether to Party A for the time and according to the new design and construction scheme on business? The responsible party should be mainly in the reconnaissance unit, shall lead, survey scheme design, construction units to follow up, negotiate to amend the original part of foundation pit construction scheme and construction) 2. provide control of the coordinates and elevation point data inaccuracies or errors. (in the construction approach, construction, measurement line time should be able to find the problem in a timely manner through the supervision coordination request Party A to the original design and reconnaissance units provide specific plane control points and leveling points,

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档