- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
金蝶标准安装教程
1、先在浏览器中输入网址。如下:
2、鼠标点到“金蝶KIS迷你版、标准版V8.0”点击右键“目标另存为”
3、选择安装路径并核对下载内容是否正确
4、根据地址找到所下载的压缩包并双击打开
5、双击打开“kis8.0标准版及迷你版”文件夹,并找到“KISSetup.Exe”文件双击
6、安装程序打开,安装“金蝶KIS标准版”
7、根据提示点击下一步安装即可
8、点击浏览选择安装路径
9、等待安装
10、安装完毕
11、在桌面找到金蝶图标
manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the projects quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the projects quality control Department; Site design: Project Engineering Department; Contract: the contract budget
manufacturers of technical documents on the quality requirements applicable to this project. Construction
您可能关注的文档
最近下载
- GB51364-2019 船舶工业工程项目环境保护设施设计标准.pdf VIP
- 2026中国能源建设集团山西电力建设有限公司招聘笔试备考试题及答案解析.docx VIP
- 2026中国能源建设集团山西电力建设有限公司招聘笔试参考题库附答案解析.docx VIP
- 2026中国能源建设集团山西电力建设有限公司招聘笔试备考题库及答案解析.docx VIP
- 三菱激光钻孔机培训课件.ppt VIP
- 浙江省宁波市鄞州区2024—2025学年上学期七年级数学期中测试卷(含答案).docx VIP
- 湘美版七年级上册美术第六课《让图表说话》教案.docx VIP
- 2023年苏密杯密码知识竞赛题库附答案(第301-400题).pdf VIP
- 张培基英汉翻译教程.doc VIP
- 建筑初步设计-第二章--西方现代建筑简介.ppt VIP
原创力文档


文档评论(0)