土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master)
土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master)
Earthwork volume conversion table glossary:
Loose fill volume: Backfill
After tamping volume: the compacted soil
Natural volume: dense untouched soil
Virtual Party: volume of loose soil dug under natural conditions
The difference between excavation and earthwork excavation foundation list list:
Earthexcavation: for a separate section of earth.
Digging earthwork Foundation: for in addition to a separate section outside the earth.
The general is on top of compacted area or foundation cushion area according to the calculated?
According to the general calculation of tamp foundation cushion area.
The base brazing is calculated according to the sloping bottom or top?
The pit bottom calculation.
How much is the non working surface of concrete cushion width?
Non concrete cushion does not need to keep working face excavation large area fill cushion size.
The cushion surface slope, foundation work is based on the surface or cushion?
According to the 0.1 cushion.
The difference of dynamic compaction and compaction of the soil:
Compaction: backfill soil compaction. As the foundation excavation, backfill foundation after finish, need to backfill soil compaction.
The original soil compaction: unexcavation without backfill site, in order to ensure the bearing capacity of the original ground tamp. Such as the selection of basic indoor ground, need to consolidate after decoration.
The difference between homework assignments and the pit pit:
Pit operation: machinery has been operating in the pit, and a machine under the ramp.
Pit operation: outdoor terrace to the foundation, has been in the outdoor floor work machinery.
The artificial substrate and the meaning of slope trimming:
The rock blasting of bottom and slope after artificial cleaning and dressing.
The difference between the mud and sand flow:
Sludge deposition and soil organic matter in water and slow water environment.
The flow of sand: eart
您可能关注的文档
最近下载
- 期末测试卷(试题)-2024-2025学年人教PEP版(2024)英语三年级上册.docx VIP
- 高二年级第一次月考质量分析化学.doc VIP
- 人教部编版小学语文三年级上册期中质量检测试题(答案+评分标准).pdf VIP
- 小红书2023“家生活”趋势白皮书-青年志&安娜&奥维云网-2023-64页.pdf
- 小学生主题班会 垃圾分类(课件).pptx
- 江西省南昌市八年级上学期期中数学试卷附参考答案.pdf VIP
- QC∕T 948-2013 汽车顶部装载装置.pdf
- 2024年浙江事业单位招聘-宁波慈溪市机关事业单位编外招5人考试备考题库及答案解析.docx VIP
- 风险评估及控制管理流程 2023年ISO15189医学实验室管理体系.docx VIP
- 滴灌在园林绿化中的应用及前景.doc VIP
文档评论(0)