土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master).doc

土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master)

土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master) Earthwork volume conversion table glossary: Loose fill volume: Backfill After tamping volume: the compacted soil Natural volume: dense untouched soil Virtual Party: volume of loose soil dug under natural conditions The difference between excavation and earthwork excavation foundation list list: Earthexcavation: for a separate section of earth. Digging earthwork Foundation: for in addition to a separate section outside the earth. The general is on top of compacted area or foundation cushion area according to the calculated? According to the general calculation of tamp foundation cushion area. The base brazing is calculated according to the sloping bottom or top? The pit bottom calculation. How much is the non working surface of concrete cushion width? Non concrete cushion does not need to keep working face excavation large area fill cushion size. The cushion surface slope, foundation work is based on the surface or cushion? According to the 0.1 cushion. The difference of dynamic compaction and compaction of the soil: Compaction: backfill soil compaction. As the foundation excavation, backfill foundation after finish, need to backfill soil compaction. The original soil compaction: unexcavation without backfill site, in order to ensure the bearing capacity of the original ground tamp. Such as the selection of basic indoor ground, need to consolidate after decoration. The difference between homework assignments and the pit pit: Pit operation: machinery has been operating in the pit, and a machine under the ramp. Pit operation: outdoor terrace to the foundation, has been in the outdoor floor work machinery. The artificial substrate and the meaning of slope trimming: The rock blasting of bottom and slope after artificial cleaning and dressing. The difference between the mud and sand flow: Sludge deposition and soil organic matter in water and slow water environment. The flow of sand: eart

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档