- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
王庄隧道喷施工作业指导书
王庄隧道中导洞Ⅳ级围岩临时支护
施工作业指导书
一、编制依据及原则
1、编制依据
(1)小河至安康高速公路南段路基桥隧工程施工招标文件
(2)现场资料3)国家、省、市现行有关法规、技术规范、定额等
中国铁路工程总公司小康高速公路N13合同段
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure that network can be implemented. 6, stable conditions for planning and supporting of Yibin city track traffic construction and formation of rail transit industry, provide conditions for the start-up and development of rail transit in Yibin city. 1.7 technical course technology is the projects research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure 1.7-1 Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with follow-up planning tasks. Network planning Urban planning system in a transitional position, online network planning is completed, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning; 2, the partitioning for network planning; 3, joint planning of rail transport and urban transport in other ways; Detailed technical courses see below. Figure 1.7-2 General technology route figure 2nd chapter City status and development planning 2.1 city basic profile 2.1.1
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Y
您可能关注的文档
最近下载
- 八年级学生数学典型错题的成因及教学对策研究.pdf VIP
- G100G150E150激光器中文用户使用指南.pdf VIP
- 《安全系统工程(第3版)》全套教学课件.pptx
- 具身智能在社会治理中的应用与挑战.docx VIP
- 北师大版九年级数学上册特殊平行四边形《单元知识梳理复习题》示范公开课教学课件.pptx VIP
- 北师大版九年级数学上册特殊平行四边形《知识梳理复习题》示范公开课教学课件.pptx VIP
- 武冷双机双级螺杆式压缩机使用说明书.pdf VIP
- 《习作:______让生活更美好》课件.pptx VIP
- 《江苏省 JGT046-2016 岩棉外墙外保温系统应用技术规程》.pdf
- 新《公司法》修订要点解读.pptx VIP
原创力文档


文档评论(0)