3070英文.pptVIP

  • 19
  • 0
  • 约2.25万字
  • 约 76页
  • 2017-08-30 发布于河南
  • 举报
3070英文

gary-lg_liu@A ASRU Calibration start C D primary structure Fixture Pull-down System Vacuum System Functions of Compressed Air and Vacuum: Compressed air : drives the fixture pull-down towers on the testhead(80psi) 3070 Series 3 requires reduced air pressure to switch the internal valves(40psi) Vacuum : draws the board under test down onto spring-loaded test probes in the fixture. SPU Heartbeat when the testhead boot process is initiated, a program called pmmonitor is run. pmmonitor ping the communication p

文档评论(0)

1亿VIP精品文档

相关文档