北京2001年预算定额的计算规则(Rules for the calculation of budget quota for Beijing in 2001).docVIP

北京2001年预算定额的计算规则(Rules for the calculation of budget quota for Beijing in 2001).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
北京2001年预算定额的计算规则(Rules for the calculation of budget quota for Beijing in 2001)

北京2001年预算定额的计算规则(Rules for the calculation of budget quota for Beijing in 2001) Beijing 2001 budget quota calculation rules, which did not say, is to refer to the national installation engineering quota calculation rules ~ ~! - Book description A fifth book, heating, water supply and drainage, gas engineering (hereinafter referred to as the norm), including indoor and outdoor station, pipeline, valve and flange, sanitation, heating equipment, fire fighting equipment and accessories, gas pipelines, accessories and equipment, pressure vessels, appliances, boilers and auxiliary equipment, pumps and damping device cold, warm, hot, accessories and engineering instruments, casing and piping, equipment support, pipeline testing and inspection, paint, insulation and other fifteen chapters. Two, indoor and outdoor pipeline boundaries Division: station type pipeline to station or computer room outer wall skin as boundary, other pipes to building exterior wall leather 1.5m as boundary. Three, seamless steel pipe diameter 159mm, cast iron pipe nominal diameter 250mm, other steel pipe nominal diameter 150mm outdoor pipe, according to the design requirements, the implementation of eighth copies of municipal pipe project quota. Four, the division of the quota pressure (except as otherwise provided in each chapter): Low voltage: P = 1.6Mpa; P = 10MPa; voltage: high voltage: p10mpa Five, the fixed operating height (refer to crop height from the ground floor of the operating distance), in addition to the provisions of chapters otherwise, compiled according to the following 5m, such as more than 5m, the exceeding part of artificial labor multiplied by the number of the following: Operation height is less than 12M, within 16m, outside 8m, 16M Ultra high coefficients 1.10, 1.15, 1.2, 1.25 Six, this quota work efficiency is according to the building eaves height 25m preparation, more than 25m high-rise buildings, press the table to calculate the high-rise building ultra high cost (with l

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档