- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
100条施工经验(100 construction experience)
100条施工经验(100 construction experience)
100 construction experience
Author: xfx998 classification: process skills submission date: 2007-7-16 9:44:00 browsing: 175
AP 100 construction experience
AP 1, waterproof coating waterproof construction should be adopted
AP 2, waterproof engineering in construction should be hidden after completion and acceptance to do
AP 3, after the completion of the waterproof construction is done 2 times water test
AP 4, bathroom waterproof layer should be not less than 1.8 meters
AP 5, floor drain, corner, pipeline and other places to do a waterproof
AP 6, the floor drain to use deodorant floor drain
AP 7, hot and cold water left right cold heat
AP 8, try not to walk on the ground from the water
AP 9, cold water pipe protection layer in the wall to have 1CM, the hot water pipe is 1.5CM, therefore slot to open the deep
AP 10, PPR tube is to consider with the thickness of the ceramic tile, so that the pipe not exposed
AP 11, cook for a few minutes, wash the vegetables to for a long time, must buy big basin
AP 12, leading and basin to complete, if not properly hold up
AP 13, toilet installation cannot be used to cement, silica gel
Should pay attention to the protection of the brand 14, toilet, faucet after installation
AP 15, buy toilet should be considered when the toilet hole distance
AP 16, the washing machine is to consider the drainage or drainage
AP 17, the bathroom is best not to install the phone, easy to damp
AP 18, the mirror in the bathroom to consider a good size, otherwise lens headlight is easy to put on high
AP 19, the bathroom had better stay pipeline manhole
AP 20, electric cannot put on the same pipe.
AP 21, left and right zero phase grounding
Which was 22, 300 from the power supply socket, switch 1.2 meters
AP 23, do not install the switch at the back of the door
AP 24, the socket should be good
With a 16A socket which was 25, high-power electrical appliances, such as electric oven, etc.
Which was 26, with good cassette
AP 2
您可能关注的文档
- (txt版本的)2010-2011学年第一学期形势与政策课免费答案((txt version) free answer for the first semester of the 2010-2011 academic year).doc
- (pmu专稿)援外工程项目施工监理((PMU) construction supervision of foreign aid project).doc
- (广州)检测技术有限公司-岛津_2011830324120051((Guangzhou) Testing Technology Co., Ltd. - SHIMADZU _2011830324120051).doc
- (必读)图片简介((required) picture introduction).doc
- (二)以顾客满意为目标,完善服务质量的管理((two) with customer satisfaction as the goal, improve the quality of service management).doc
- (新版)轮胎翻新技术制造工艺专利大全全文文集((New Edition) tire retreading technology, manufacturing technology patent, Daquan, full text).doc
- (扩词)识字1—课文26((expansion) literacy 1 - text 26).doc
- (二)、人物故事((two) character stories).doc
- (世袭金银财富金银争霸)如何做一名成功的黄金操盘手((hereditary gold and silver wealth, gold and silver contend for hegemony) how to be a successful gold trader).doc
- (精)麦肯锡提案标准流程((standard) McKinsey proposal standard process).doc
文档评论(0)