5876设备选型(5876 equipment selection).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
5876设备选型(5876 equipment selection)

5876设备选型(5876 equipment selection) 10 January 2008 afternoon, mining deputy general Xu Xiaoming hosted the 5876 meeting of the working surface equipment selection, to participate in the meeting were: Li Zhuang, Liu Yunsheng, Sun Hequan, Gao Qiusheng, Wang Zhizhong, Xu Xiangming, Wang Shunyou, willow, fan, Liu Zhongyi, Qi Guanglian, Ya Dong, Zhang Aimin, Wang Lianying Song Jianguo, Li Weiping, Zhang Zhongdong, Wang Huimin, Yu Hongde, Ji Xiangjiang Wang Jianbin, Zhang Yun, Nie Shuming, Wang Hesheng, Li Lijun. The meeting determines that the installation way in 5876 is: belt Road, transportation belt, upper support installed, lower mouth closed, mouth closed. Selection of main equipment in working face: 1, mining face to install ZY4200-17/38 and ZY4200-15/35 hydraulic support a total of 83 groups, starting from the mining face under mounting bracket 67 ZY4200-17/38 group, sixty-eighth ZY4200-15/35 group started by the installation of hydraulic support in 16 groups, the lower end of the use of ZY4200-17/38 hydraulic support group 3, head ZY4200-15/ 35 hydraulic support group 3. Install a SGB-730/320 conveyor, a MWG-475 shearer. 2, belt Lane installation SZB-730/75 reprint machine one, PCM - 110 crusher one, DSJ-1000/2 * 160 belt machine one. 5875 side of the eye, installation of SZB-730/75 loader 1 parts, 5875 side eye installation DSJ-1000/2 x 160 belt machine one, horizontal Chuan installation SZB-730/75, reproduced machine 1. 3, change the train installed in the belt lane, the initial distance from the mining surface 200 meters. Install 630KVA shift to 2 units, combination switch, feed each. The cable hanging device is complete. 4, in the 5875 side eye (5876 belt Lane opening 10---35 meters), install a RB-200/31.5 emulsion pump (three pumps a box). 630KVA shift to 1 units. 5, back into the liquid belt lane, into the liquid pipe, a 2 inch high pressure seamless steel pipe, back to the liquid pipe, a 2 inch ordinary steel pipe. High pressure liquid inlet main road ever

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档