安装电工的注意事项(Precautions for installation of electrical work).docVIP

安装电工的注意事项(Precautions for installation of electrical work).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安装电工的注意事项(Precautions for installation of electrical work)

安装电工的注意事项(Precautions for installation of electrical work) Ten years of grinding sword, frost blade has never tried. Raising my head, I see the moon so bright; withdrawing my eyes, my nostalgia comes around。 Quiet, deep Buddhist temple garden. It is a delight to learn while learning. Q-how can worry about, like a river flows to the east. The insulation performance, mechanical strength, material structure and size of the special tools for electric safety shall be in accordance with the regulations, properly kept, prohibited from being used by them, and shall be checked and checked regularly. In the construction site construction must have more than two people can work. The use of all kinds of power tools should comply with the hand power tools management, use, inspection and maintenance safety technical regulations (GB 3787) and annex and small and medium-sized construction machinery regulations. No load or power supply is forbidden on line, live operation is forbidden. When preparing epoxy resin asphalt cable joint, the operation place shall be well ventilated and put on protective articles. Melting solder, tin blocks, tools used to dry, to prevent detonation. Do not use the soldering thermoelectric container rubber cable. High altitude pouring, no one below. No leakage, leakage and blockage of burner, without ignition in the inflammable and explosive places and use. After work, extinguish the fire and deflate the air. An electric shock, immediately cut off the power supply, emergency treatment, electrical fire, should be immediately cut off the power supply, use fire extinguishers or dry sand fire. Install switch for high pressure switch, automatic air switch and return spring. Switch shall be placed in disconnected position. When a plurality of power distribution boxes (plates) are installed, the finger shall not be placed at the joint of the two plates, nor the connecting screw holes can be touched. Tick groove drill, hammer shovel should not loose, no curling, c

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档