- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安装电工的注意事项(Precautions for installation of electrical work)
安装电工的注意事项(Precautions for installation of electrical work)
Ten years of grinding sword, frost blade has never tried. Raising my head, I see the moon so bright; withdrawing my eyes, my nostalgia comes around。 Quiet, deep Buddhist temple garden. It is a delight to learn while learning. Q-how can worry about, like a river flows to the east. The insulation performance, mechanical strength, material structure and size of the special tools for electric safety shall be in accordance with the regulations, properly kept, prohibited from being used by them, and shall be checked and checked regularly.
In the construction site construction must have more than two people can work.
The use of all kinds of power tools should comply with the hand power tools management, use, inspection and maintenance safety technical regulations (GB 3787) and annex and small and medium-sized construction machinery regulations.
No load or power supply is forbidden on line, live operation is forbidden.
When preparing epoxy resin asphalt cable joint, the operation place shall be well ventilated and put on protective articles.
Melting solder, tin blocks, tools used to dry, to prevent detonation.
Do not use the soldering thermoelectric container rubber cable. High altitude pouring, no one below.
No leakage, leakage and blockage of burner, without ignition in the inflammable and explosive places and use. After work, extinguish the fire and deflate the air.
An electric shock, immediately cut off the power supply, emergency treatment, electrical fire, should be immediately cut off the power supply, use fire extinguishers or dry sand fire.
Install switch for high pressure switch, automatic air switch and return spring. Switch shall be placed in disconnected position.
When a plurality of power distribution boxes (plates) are installed, the finger shall not be placed at the joint of the two plates, nor the connecting screw holes can be touched.
Tick groove drill, hammer shovel should not loose, no curling, c
您可能关注的文档
- 国际经济法案例1(Case of international economic law 1).doc
- 国际贸易-论中国纺织品服装出口企业应对环境标志制度的对策(International Trade - Countermeasures for China's textile and garment exporting enterprises to deal with environmental labeling system).doc
- 地下城主攻略(Dungeon Raiders).doc
- 地产白酒开店的四种选择(Four choices of real estate liquor shop).doc
- 地产股还有炒作空间(Real estate stocks as well as speculation space).doc
- 地下室钢筋绑扎技术交底(Basement reinforcement banding technical disclosure).doc
- 地产股疯牛探秘(Real estate stocks mad Quest).doc
- 地产转型期涌管理现房企高管离职潮(Real estate transformation period management Xianfang enterprises executives turnover tide).doc
- 地图使用方法,新手必看。(Map usage, novice must see.).doc
- 地图使用说明(Map usage instructions).doc
- 安阳一座重工业城市的经济转型(Anyang the economic transformation of a heavy industrial city).doc
- 宏景ehr成管理功签约云南澜沧江实业有限公司(Wang Jing EHR management work signed Yunnan Lancang Jiang industry Co., Ltd.).doc
- 宏景ehr成管理功签约河南教育报刊社(Hong Jing EHR management work signed Henan Education Press).doc
- 定时关机命令(shutdown).doc
- 定时器小结(Timer summary).doc
- 定桨距与变桨距-风力发电机组(Fixed pitch and variable pitch wind turbines).doc
- 安徽芜湖南陵汽车上牌流程(Anhui Wuhu Nanling car license process).doc
- 定位控制在冷轧生产线的应用(Application of positioning control in cold rolling production line).doc
- 安装gps的车辆被盗赔偿责任应如何分担(How should the compensation for the stolen vehicles installed GPS be shared).doc
- 定速巡航系统故障两例(Cruise control system failure two cases).doc
文档评论(0)