- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浙江省天台县平桥第二中学高三英语-上学期读写备考训练12
浙江省天台县平桥第二中学2014届高三英语 上学期读写备考训练12
A(11JS)
According to the US government, wind farms off the Pacific coast could produce 900 gigwatts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills(see picture)to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere.
The project, called Hywind, is the world’s first large-scale deepwater wind turbine(涡轮发电机).Although it uses a fairly standard 152-ton,2.3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above the water on a floating spar(see picture),a technology Hywind’s creator, the Norwegian company StatoilHydro, has developed recently. The steel spar, which is filled with stones and goes 328 feet below the sea surface, will be tied to the ocean floor by three cables(缆索);these will keep the spar stable and prevent the turbine from moving up and down in the waves. Hywind’s stability(稳定性)in the cold and rough sea would prove that even the deepest corners of the ocean are suitable for wind power. If all goes according to plan, the turbine will start producing electricity six miles off the coast of southwestern Norway as early as September.
To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s center of gravity must be moved much closer to the ocean’s surface . To do that , the company plans to design a new kind of wind turbine, one whose gearbox(变速箱) sits at sea level rather than behind the blades (see picture )Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large. Out at sea, the wind is often stronger and steadier than close to shore, where all existing offshore windmills are planted. Deep-sea farms are invisible f
您可能关注的文档
- 山西省北师大大同附中高一生物上学期第二次月考试题.doc
- 山西省吕梁学院附中高一历史上学期第二次月考试题-(含解析).doc
- 山西省大同市一中高一化学上学期期中试题.doc
- 山西省大同市一中高一历史上学期期中试题.doc
- 山西省大同一中高一英语上学期期中试题(含解析).doc
- 山西省大同市一中高一地理上学期期中试题.doc
- 山西省大同市一中高一物理上学期期中试题.doc
- 山西省大同市一中高一政治上学期期中试题.doc
- 山西省大同市一中高一数学上学期期中试题.doc
- 山西省大同一中、同煤一中高三数学上学期期末联合考试试题-文.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练11.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练10.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练13.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练16.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练15.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练18.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练19.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练2.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练20.doc
- 浙江省天台县平桥第二中学高三英语-上学期读写备考训练21.doc
最近下载
- GB50003-2011 砌体结构设计规范.doc VIP
- 三年级上册劳动人民版雏菊盆景迎重阳教学设计.docx VIP
- 沪教牛津版英语2024七年级上册全册知识清单(记忆版).pdf
- 2025年电子科技大学附属肿瘤医院·四川省肿瘤医院招聘笔试备考题库及答案解析.docx VIP
- 低空空域风切变灾害预警与飞行安全协同控制体系研究.docx VIP
- 2025至2030中国汽车检测行业发展分析及发展趋势分析与未来投资战略咨询研究报告.docx
- 力士乐样本1-液压泵和马达.pdf VIP
- 儿童,颜色,填涂画.docx VIP
- 第六单元+资本主义制度的初步确立+复习课件+2023--2024学年部编版九年级历史上学期.pptx VIP
- 学堂在线 人工智能原理 章节测试答案.docx VIP
文档评论(0)