- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
vb导出exel(VB export Exel)
vb导出exel(VB export Exel)
Emerson project two bunkers, retaining walls (including earth and stone) construction works
Environmental impact assessment, second times, publicity
Mianyang hi tech Industrial Development Zone Management Committee commissioned by the Southwest Jiao Tong University School of environment science and engineering program Emerson project two bunker ridge, retaining wall (including earthwork) construction project environmental impact report table, according to the Peoples Republic of China Department of environmental protection issued in February 14, 2006 public participation in environmental impact assessment procedures (UNCED No. 2006[28]) regulations, the Emerson project two bunker ridge, retaining wall (including earth) information about construction project of public participation in environmental impact assessment to the public. Publicity content as follows:
I. Basic Situation of the project
Project Name: Emerson project, two bunkers, retaining walls (including earth and stone) construction works
Construction unit: Mianyang hi tech Development Zone Management Committee
Nature of the project: New
Construction site: Hi tech Zone, Shiqiaopu
Amount of investment: 8 million yuan
Construction scale and content: the construction of the fort, cutting and retaining walls of about 1200m, excavation of earth and stone, about 100 thousand m3.
Two, environmental impact information publicity
1, the main environmental impact
Ecological environmental impact: the fort cut and retaining wall are involved in the construction land, during the construction of temporary land, but only by the construction period and after a short period of time the impact of land, after a recovery period, not the condition of land use change, can still maintain the original use of power the. The main ecological environmental impact of the project is in the construction period, the project is very small to the surrounding ecological environment impact of the project, as long as th
您可能关注的文档
- internet原理第2次作业(互联网原理第2次作业).doc
- ielts守则(ielts守则).doc
- ie工业工程应用实战训练(Ie practical training in industrial engineering applications).doc
- in语09年5月(In, 09 years, May).doc
- iptables做网关的脚本(Iptables scripting for gateways).doc
- ipo利润包装不合格上市公司制造流程(IPO profit packaging nonconforming manufacturing process of listed companies).doc
- italiano(意大利语).doc
- it运维变革引发的问题思考(Thinking about problems caused by it operation and maintenance transformation).doc
- it面试(It interview).doc
- java1(Java1).doc
- vb教程-定时闹钟程序(VB tutorial - timer alarm program).doc
- vb综合作业(VB comprehensive operation).doc
- vcenter server 5.0 安装实战(5安装实战vCenter服务器).doc
- vc代码收集(VC code collection).doc
- vip才是印钞机锁定团购大客户(三)(VIP is a money printing machine locking big customers (three)).doc
- wangzhan(望展).doc
- tof(TOF).doc
- web2.0时代的领导艺术 如何化解职场战争(How to defuse the workplace war by the art of leadership in the Web2.0 era).doc
- week 1 lesson 2(每周1节课 2).doc
- what they said2(他们said2).doc
文档评论(0)