网站大量收购闲置独家精品文档,联系QQ:2885784924

Engineering Change Notice UFL MAE(工程变更通知UFL美).pdf

Engineering Change Notice UFL MAE(工程变更通知UFL美).pdf

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Engineering Change Notice UFL MAE(工程变更通知UFL美)

Engineering Change Notice Definition An Engineering Change Notice (ECN) is a document authorizing and recording design changes throughout the prototyping and life-cycle phases of a product. ECN documentation contains the justification for changes made to a component or system once the initial design is complete. It also forces changes to be approved by the relevant authorities (typically the project manager). An ECN must contain at least the following information (Ullman 2009): • Identification of what needs to be changed. This should include the part number and name of the component and reference to drawings showing the component in detail or assembly. • Reason(s) for the change. • Description of the change. This includes a drawing of the component before and after the change. The drawings must clearly show the detail(s) affected by the change. • List of documents (and in industry, the departments) affected by the change. The most important part of making a change is ensuring all pertinent groups are notified and all documents updated. • Approval of the change. As with the detail and assembly drawings, the changes must be approved by management. • Instruction about when to introduce the change—immediately (scrapping current inventory), during the next production run, or at some other milestone. Application for EML2322L On any engineering project, the design work should conclude before manufacturing commences. Sometimes we rush through the design phase because we are excited to begin fabrication. Design changes made in the manufacturing phase are much more costly than changes made during the initial design phase. To prepare for what’s expected of us in industry (and to do the best job possible during the initial design phase), teams must fill out an ECN for any change(s) made once the second design report is formally submitte

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档