Installation and Operation Instructions (安装和操作说明).pdfVIP

Installation and Operation Instructions (安装和操作说明).pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Installation and Operation Instructions (安装和操作说明)

Peerless Pump Company PJPC Jockey Pump Controllers Installation and Operation Instructions Peerless Pump Company 2005 Dr. M. L. King Jr. Street Indianapolis, IN 46202 Bulletin 4857341 Rev. December 21, 2005 PJPC Instructions Jockey Pump Controllers WARNING! DO NOT ATTEMPT TO INSTALL OR PERFORM MAINTENANCE ON EQUIPMENT WHILE IT IS ENERGIZED! DEATH, PERSONAL INJURY, OR SUBSTANTIAL PROPERTY DAMAGE MAY RESULT FROM CONTACT WITH ENERGIZED EQUIPMENT. ALWAYS VERIFY THAT NO VOLTAGE IS PRESENT BEFORE PROCEEDING, AND ALWAYS FOLLOW GENERALLY ACCEPTED SAFETY PROCEDURES. JOCKEY PUMP CONTROLLER CIRCUIT BREAKER ON-OFF SWITCH MUST BE IN THE OFF POSITION TO OPEN THE ENCLOSURE DOOR. PEERLESS PUMP COMPANY CANNOT BE LIABLE FOR ANY MISAPPLICATION OR INCORRECT INSTALLATION OF ITS PRODUCTS. MOUNTING CONTROLLER NOTE - Consult the appropriate job plans to determine the controller mounting location. Tools and materials (wall mounting) required: 1. Assortment of common hand tools of the type used to service electromechanical equipment. 2. Drill for drilling wall anchor holes. 3. Hand level. 4. Tape Measure. 5. Four anchors with bolts and washers, per enclosure. 6. ¼ end wrench for adj usting pressure switch on-off and differential settings. MAKING ELECTRICAL CONNECTIONS IMPORTANT PRECAUTIONS. Prior to mounting the controller and making any field connections: 1. Verify that the following information is compatible with other related equipment on the project: A. Motor horsepower, voltage, phase and frequency. (See Page 5) B. System pressure 2. The project electrical contractor must supply all necessary wiring for field

文档评论(0)

hhuiws1482 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档