- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SECTION 5 STORM DRAINS AustinTexas.gov(第五节雨水渠AustinTexas.gov中)
Drainage Criteria Manual
SECTION 5 - STORM DRAINS
5.1.0 GENERAL
This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and
their appurtenances in a storm drainage system. Hydraulically, storm Storm drainage systems include open
channels or enclosed consist of conduits (open or enclosed) in which unsteady and non-uniform flow exists.
Enclosed conduits may be either reinforced concrete pipe or reinforced concrete box culverts meeting the
City Standard Specifications for these products. The design storm shall be the 25-year storm with provisions
made for the 100-year storm as noted in Section 3.
5.2.0 DESIGN GUIDELINES
The following rules shall are to be observed in the design of storm drain systems components to be located
in public right-of-way or public drainage easements in order to promote proper operation of these systems
and to minimize maintenance requirements of those systems:
A. Select pipe size and slope so that the velocity of flow will increase progressively or at least will not
appreciably decrease at inlets, bends or other changes in geometry or configuration.
B. Do not discharge the contents of a larger pipe into a smaller one even though the capacity of the
smaller pipe may be greater due to a steeper slope. For projects where a proposed storm drain system
associated with the project has greater capacity than an in-place receiving system, and an upgrade to the
receiving system is not imminent, a temporary exception may be allowed. For this exception to be allowed,
the design of the system must incorporate temporary features as needed to prevent any increase in flooding
due to the improved conveyance of the proposed upstream system. The proposed system with interim
featu
您可能关注的文档
- Schelling’s Aesthetic Turn in the System of (谢林的审美的系统).pdf
- Schematics for Breakout Examples(图表突破的例子).pdf
- Scheme of Teaching and Examination for SBTE (SBTE方案教学和考试).pdf
- SCHEME SYLLABUS OF III IV SEMESTERS B.E.(第三第四学期B.E.的计划大纲).pdf
- Schizophrenia Disorder Diagnostic Tool(精神分裂症疾病诊断工具).pdf
- School Improvement Research Series (学校改进研究系列).pdf
- SCHOOL OF CIVIL AND ENVIRONMENTAL (学校土木与环境).pdf
- SCHOOL OF ENGINEERING BUILT (工程学院建).pdf
- SCHOOL of ENGINEERINGand PHYSICAL (ENGINEERINGand物理学院).pdf
- School of Mechanical and Chemical Engineering (学校的机械和化学工程).pdf
- 2024年度云南省成人高考专升本《教育理论》考试模拟卷(含答案).pdf
- 2024年办公室文员工作总结标准范文(6篇).pdf
- 2024年安全生产月活动总结示范文本(四篇).pdf
- 2024年山西省禁毒知识网络竞赛试题库及答案.pdf
- 2024年人教pep版五年级下册英语Unit 4综合检测试卷及答案.pdf
- 2024年中考物理必刷模拟卷(广州专用)模拟卷1(原卷版).pdf
- 2024年度山东“大学习、 大培训、 大考试”培训题库(含答案).pdf
- 2024年学校年度工作计划(三篇).pdf
- 2024届甘肃临夏和政县中考英语考前最后一卷含答案.pdf
- 2024年度开展“大学习、 大培训、 大考试”题库及答案.pdf
文档评论(0)