zl专业材料(ZL professional materials).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
zl专业材料(ZL professional materials)

zl专业材料(ZL professional materials) Employer (full name): Contractor (full name): In accordance with the Peoples Republic of China contract law, Peoples Republic of China Construction Law and other relevant laws and administrative regulations, the principle of equality, voluntariness, fairness and honesty and credit principle, the two sides on the construction matters agreed to enter into this contract. I. engineering name: Two, address: Three, contract content: EPS exterior wall insulation system Four, contracting way: labor contractor material Five 、 total price and payment method: 1, the project price: / square meters (including materials, construction, transportation) 2, the total amount of the project: square meters, engineering settlement according to the actual construction area, change and construction units settled visa. 3 each quantity: square meters 4, the total project price: RMB yuan. The price of each project is RMB yuan. 5, payment methods: (1) Party B shall pay 20% of the total contract value within 7 working days after the materials are entered; (2) 40% of the total value of each contract shall be paid within 5 days after each insulation board has been checked and accepted; this paragraph shall be paid by the peasants. When completed, Party A shall report to Party A the amount of work completed in each building within 7 working days, and Party A shall pay to Party B 35% of the remaining works within 6 days after verification by Party A. The payment unit is for each (3) the balance shall be paid within ten days after the completion of the project for 3 months and no quality problems within 5% days. Six, construction period: days (Party A has construction conditions 5 days ahead of notice to Party B). Due to climate and other factors caused by the shutdown, the duration of the project will be postponed; if Party B in case of construction obstacles, and party a consultation, approved by Party A may be appropriately extended; if the time limit for change,

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档