- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塔吊基础施工方案(Construction scheme of tower crane foundation)
塔吊基础施工方案(Construction scheme of tower crane foundation)
The construction scheme of tower crane foundation (2m -) Guiqiu Views: 1662 reward points: 0 | question time: 2009-5-4 17:43 | questionger: kunak
The construction is carried out, but the program does not know how to write, please master moves to save younger brother! We are using 40 cranes, only free height (27.6m). I do now is 2m 2:8 lime soil cushion, crane foundation edge 1m. vertical stand, but no solution ah, distressed beg!!!
Recommended answer, this is what I have done before a program, to see if there is any help to your place.
Special project of tower crane
Selection of tower crane and location selection
The project uses two tower cranes. Because of the construction site, also need to consider the construction and coverage of a tower crane, 40 tower cranes have been installed, a 63 tower crane foundation installed on the podium foundation structure, 6 ~ 7 ~ C axis /B axis, can meet the needs of the subject construction.
For a 63 tower is located in the stone foundation structure, tower foundation construction, installation scheme to design the specific construction units.
Two tower crane installation time
In order to make the Tower Crane put into use as soon as possible, the tower crane foundation shall be used as soon as possible, and the crane shall be put into use as soon as possible in the construction of the pile cap.
Three tower crane foundation construction
1, 63 tower crane cap earthwork and main structure earthwork simultaneous excavation, excavation depth is the same (above the base elevation -6.4m), cap thickness 1.35M, cap size is 6.0m * 6.0m, requires ground allowable pressure 1.0kg/cm2.
2. The foundation adopts the fixed type of base section, and the cap concrete is C30.
3, the base center, that is, tower crane center position, see the floor plan.
4. The relative error of the basic embedded section is controlled within 5mm. The foundation section and the horse stool, the horse stool leg a
您可能关注的文档
- 内部控制十大要点(Ten points of internal control).doc
- 内部控制案例分析(Case study of internal control).doc
- 写作2(Writing 2).doc
- 写好段落的三个标准01(Three criteria for writing a paragraph 01).doc
- 写景诗文(Scenery Poetry).doc
- 农业专题(Agricultural topics).doc
- 农业小本创业之四大模式(Four patterns of small agricultural Entrepreneurship).doc
- 内蒙古全境电厂明细(Inner Mongolia whole power plant details).doc
- 写生与油画民族化(Sketching and nationalization of oil paintings).doc
- 农伊利婴幼儿奶粉包装设计手记(Agricultural Yili infant formula packaging design notes).doc
- 墙面装饰施工工艺流程之吊顶(Ceiling of wall decoration construction process).doc
- 墨盒问题(Cartridge problem).doc
- 墙面刷漆前需要那些准备工作(Those preparations are needed before the wall painting).doc
- 士兵突击插曲(Soldiers sortie).doc
- 声乐艺术漫谈美声唱法(Talking about vocal music art Bel Canto).doc
- 夏季安全常识(Summer safety tips).doc
- 声望代码(Reputation code).doc
- 夏日适宜听的日语歌(Japanese songs suitable for listening in summer).doc
- 外交书籍(Diplomatic books).doc
- 外呼营销faq20100220(Outbound marketing faq20100220).doc
文档评论(0)