屋瓦面(Tile surface).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
屋瓦面(Tile surface)

屋瓦面(Tile surface) Construction plan of sloping roof hanging tile, 1. project overview: The roof of the project consists of flat roofs and sloping roofs with towers and tiger windows. The roof waterproof layer adopts two SBS modified asphalt waterproof coiled material, and the flat roof surface is made of fine stone concrete protection layer. The sloping roof waterproof layer with a SBS modified asphalt waterproof coiled material, the surface layer of flat tile roof. The drainage slope of flat roof is 2%, and the slope of drainage slope is 45 to 70 degrees. 2. construction sequence Slope roof: basic cleaning, sloping layer, leveling layer, waterproof layer, a smooth, sticky nail insulation board, nail batten, hanging tile, detail processing, inspection and acceptance, water test. Flat roof: basic cleaning, sloping layer, leveling layer, waterproof layer, insulation board, steel mesh, fine stone concrete and detail treatment, inspection and acceptance, caulking 3. main construction methods 3.1, find the slope layer (the thinnest 40 thick expansion cement perlite, slope) 3.1.1 mixing ratio: 1: 8 (cement: perlite) The quality, technical performance and mortar mixture ratio of the materials used in 3.1.2 must comply with the design requirements and specifications. 3.1.3 retention partition slot (and exhaust duct): 10 square 5m per square width, seam with 50PVC tube, the body around the hole, as the exhaust channel. The roof of the exhaust pipe with diameter 50PVC tube), leaving at the same time to do waterproof measures, exhaust hole height from 30 cm to the highest point on the roof. The pipe body is embedded in the roof part and is punched in the periphery. 3.1.4 the slope shall meet the design requirements. 3.2 leveling layer (25 (20, 15) thick 1: 3 cement mortar leveling layer) 3.2.1 operating conditions First, the basic level (for slope) shall be checked and accepted by concealed works, and the leveling layer shall be constructed before qualified. The drainage slope

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档