某宾馆工程技术标书(Technical tender for a hotel).docVIP

某宾馆工程技术标书(Technical tender for a hotel).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某宾馆工程技术标书(Technical tender for a hotel)

某宾馆工程技术标书(Technical tender for a hotel) This paper contributed by cfanhz. Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. Technical proposal of a hotel project The first chapter explanation and compilation on the basis of the 1 chapter second section construction project overview 3 overview 3 second 4 third chapter structure characteristics of construction preparation and construction of the general layout and management measures of the first 4 day construction preparation 4 section second general layout of construction and management of the 14 third quarter total construction plane 15 chapter fourth construction management measures the organization management and the main labor mobilization plan 16 section project construction management organization and responsibility division 16 section second labor mobilization plan 17 chapter fifth construction machinery equipment 18 section of earthwork construction machinery and equipment is equipped with 18 stage second basement structure construction stage of mechanical equipment is equipped with 19 section third of the main structure of the construction machinery and equipment is equipped with 20 stage fourth decoration and installation construction machinery and equipment is equipped with 21 fifth tower cranes, cargo lift And rapid installation and disassembly 21 lifting frame The sixth section of the mechanical equipment operation, maintenance and repair of the 22 chapter sixth construction and comprehensive deployment schedule of 23 first comprehensive management target of 23 second 23 third day construction deployment construction schedule arrangement 24 seventh chapter sub engineering construction method of 24 section construction survey control 24 section second earthwork and slope maintenance and reduction the 33 section of the third drainage measures of basement structure engineering 36 fourth 49 sixth section of main structur

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档