2008清单计价规范(造价员理论考试整理资料)(2008 list price specification (cost theory, examination arrangement data)).doc

2008清单计价规范(造价员理论考试整理资料)(2008 list price specification (cost theory, examination arrangement data)).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2008清单计价规范(造价员理论考试整理资料)(2008 list price specification (cost theory, examination arrangement data)) 2008 (list valuation standard cost member theory test data).Txt I do not expect what, just wish you a woman as one. I remember when ah, hot days when I can be like a shirtless man! This paper contributed by haddxf829498. Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. The 2008 Code of valuation with bill of quantities 2009 cost quota amendment application forms the revised pricing table settings and the text part is consistent, the valuation table set with the standard part of the text is consistent, including the bill of quantities, bid price control, a cover, a table, the total bid price, completed 4 a cover, used in each stage of settlement price and other 22 kinds of form, greatly increased 08 and the use of standard value and operability. Use value and maneuverability. This chapter compared with 03 standard, one of the highlights of the 08 standard is compared to the original 03 specification of bill of quantities standard, standard form and BOQ table table be made one, with bill of quantities to be made one form of bill of quantities, this form of expression and the international common the valuation form is completely consistent, thus greatly reducing the probability of error for bidder two table is divided into two possible. Exactly the same, thus greatly reducing the probability of error for bidders in table two is divided into two possible. Table 5.1.1 5.1 valuation cover: 1 BQ -1 2 -2 3 letter of tender control price bid price -3 4 -4 5.1.2 total completion settlement price: -01 5.1.3 summary: 1 project bidding price control / bidding summary table -02 2 single project bidding price control / bid quotation table of tender control price / bidding summary table -04 4 project completion settlement summary table -05 5 project completion settlement summary table -06 6 projec

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档