g324线惠州东江大桥桥面维修加固设计(Maintenance and reinforcement design of Huizhou Dongjiang Bridge on G324 line).docVIP

g324线惠州东江大桥桥面维修加固设计(Maintenance and reinforcement design of Huizhou Dongjiang Bridge on G324 line).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
g324线惠州东江大桥桥面维修加固设计(Maintenance and reinforcement design of Huizhou Dongjiang Bridge on G324 line)

g324线惠州东江大桥桥面维修加固设计(Maintenance and reinforcement design of Huizhou Dongjiang Bridge on G324 line) Reinforcement design of G324 line in Huizhou Dongjiang Bridge Deck Maintenance Yang Shengping Cao Yunqiang (Huizhou City Road and Bridge Survey and Design Institute of Huizhou City, 516001) Abstract: This paper analyzes the reasons of Dongjiang Bridge Deck damaged the G324 line of Huizhou, put forward the economic and feasible scheme of bridge maintenance, strengthen deck structure integrity and deformation coordination of deck structure of vehicle loads is the key to the maintenance and reinforcement project. Key words: reinforcement deformation analysis of beam bridge structure maintenance A bridge survey Huizhou Dongjiang Bridge is the 324 National Highway Huizhou section of Dongjiang River across a major bridge, composed of old and new independent two bridges, two new and old bridge, bridge span bridge is basically the same for the 7 hole net span 75m constant section catenary of reinforced concrete hollow hingeless arch bridge, arch axis coefficient M = 2.814, vector span ratio 1/7. The approach is respectively 4 20m and 5 hole hole 20m constant section catenary reinforced concrete open spandrel arch bridge, arch axis coefficient M = 1.756, the ratio of rise to span 1/5. Full bridge length 805m, design load for steam - level 20 - 100, hang. The old bridge construction started in 1980, completed in 1982 1996 opening, building a bridge, the old bridge is the bridge surface reconstruction, demolition of the old bridge railings, sidewalks and walkways in cantilever beam, bridge deck pavement, replacing the arch filler, the transformation of the old bridge is fully consistent with the bridge deck structure, lane width, division. The bridge construction started in 1994, completed in 1996. Two, bridge deck damage disease Dongjiang Bridge bridge was opened to traffic, the bridge renovation of old bridge, opened shortly after the emergence of a large area of deck cracking,

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档