- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
gsm系统信令接续流程(Signaling process of GSM system)
gsm系统信令接续流程(Signaling process of GSM system)
GSM signaling system switching process
Based on the MS initiated calling for example, in the GSM system, the signaling required to achieve a call connection process. The application layer (L3) three (RR, MM, CC connection) as the framework, analyze the communication process of L leopard, introduces some main parameters of each signaling and the role played by signaling during the call.
The GSM system uses a simplified protocol similar to OSI protocol, including the physical layer (L1), data link layer and application layer (L2) (L3). L1 is the underlying protocol model, providing physical media transmission bit all the functions required for flow. L2 ensure the correct message and identify a single call. In the GSM system, the wireless interface (Um) on L1 and L2 respectively, TDMA frame and LAPDm protocol. On the network side, Abis interface and A interface using L1 in E1 transmission mode, L2 is respectively LAPD and MTP protocol. In the Um interface, MS every time call have established a L1 and L2 layer, and then the network side and the establishment of communication on L3. On the network side (A and Abis, the L1 interface) and L2 (except SCCP) is always in a connected state. The communication messages of L3 layer in stages and different functions for radio resource management (RR), mobility management and call control (MM) (CC) three.
1 establish a connection to the RR
RR features include physical channel management and logical channel data link layer connection etc.. In any case, the first message sent to MS system are CHREQ (channel request), requires the system to provide a communication channel, the channel type provided by the network decided. CHREQ has two parameters: the establishment of reason and random reference value (RAND). The reason for establishing MS refers to the cause of the initiate request, the reason of this case is MS calling, there are other reasons for emergency calls, call reconstruction and
您可能关注的文档
- dll木马的写法(The writing of DLL Trojan horse).doc
- dll和lib的区别(The difference between DLL and Lib).doc
- dmax最新最全快捷键(Dmax latest and most full shortcut key).doc
- dnf80版本时空之门元素以觉醒为核心加点方法(Dnf80 version of the elements of time and space, with awakening as the core, add some methods).doc
- dmvpn动态多点vpn(DMVPN dynamic multipoint VPN).doc
- djsga(djsga).doc
- dnf女漫游pk刷图点(DNF female roaming PK brush points).doc
- dm 进化意见(DM evolutionary views).doc
- dnf漫游pk加点(DNF roaming PK plus).doc
- dnf通用赚钱方法(DNF common ways to make money).doc
- 社区旧衣物回收与跨境环保处理中心2025年环保技术应用与产业发展.docx
- 《初中生图书馆资源更新与阅读评价体系构建研究》教学研究课题报告.docx
- 小学英语词汇记忆策略与跨文化交际能力培养研究教学研究课题报告.docx
- 小学书法教育课程内容与教学方法的创新研究教学研究课题报告.docx
- 社区旧衣物回收与跨境环保处理中心2025年产业政策环境与产业协同.docx
- 储能电站EPC项目数字化方案(范文).docx
- 河道修防与防冶工《工程观测、养护微信做题》考试题_2.doc
- 社区旧衣物回收与跨境环保处理中心2025年环保产业政策解读与应用报告.docx
- 储能电站EPC项目投资估算方案.docx
- 河道修防与防冶工《工程观测、养护微信做题》考试题_3.doc
文档评论(0)