- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ts题库(TS question bank)
ts题库(TS question bank)
ISO/TS 16949:2002 knowledge database
The first part: RadioButtonList
1, (A) and workplace standards.
A) workshop of the actual situation of B) ideally C) other workshop requirements D) personal requirements
2, the severity is to assess which of the following conditions: (C)
A) the frequency of occurrence of potential failure mode
B) detection of potential failure modes
C) effect of the potential failure modes
The risk priority number RPN D)
3, the reason of failure in the description of what is appropriate (A)
A) seals installed top down
B) operator error
C) equipment fault
D) according to the instructions
4, the preparation of PFMEA is based on: (A)
A) process flow chart
B) risk assessment
The C control plan)
D) histogram
5, the LPA audit is (D)
All the process of A)
B) products
C) personnel
D) process and process identification
D) requirements
6, the quality of the products is the standard (B) transmitted to the operating staff of production line
The A control plan)
B) SOS/JIS
C) drawing process.
D) PFMEA
7, the PCR report is a comprehensive statement on an issue all relevant facts, it helps us to explain the problem occurred (E), the root cause of the problem.
A) time
B place)
C) the definition of the problem
The scope of the problem of D)
E) all of the above
8, responsible person at the completion of the PCR report (D), should be signed by relevant leaders at all levels. According to the Department of manufacturing area or regional department approval bar.
A) lead department
B) primary responsibility department
C) the new responsibility department
D Department)
9, all the short-term solution, there must be responsibility for the implementation of the breakpoint information and current short-term measures to implement the state. The term shall be completed within (B).
A) 12 hours
B) 24 hours
C) 48 hours
D) 72 hours
10, all the long-term solution, there must be responsibility for the implementation of the information, and the measures for th
您可能关注的文档
- ptcd(PTCD).doc
- qq屋产品(QQ house products).doc
- python交互式程序设计导论第三周作业仅供参考(Python interactive programming introduction, third weeks of homework for reference only).doc
- qq点亮所有图标的方法(QQ lights up all icons).doc
- qq熄灭全部业务图标教程(QQ out all business icons tutorial).doc
- qq玫瑰小镇嫁接品种(QQ rose town grafted varieties).doc
- qq飞车b车大全(选车指南)(第二部分)(QQ Speed B car Daquan (car Selection Guide) (second parts)).doc
- qq遥控器匹配内部资料(The QQ remote controller matches the internal data).doc
- qq飞车抽奖必看(QQ Speed draw must see).doc
- qq飞车最新s车a车、代码(QQ Speed, the latest s car, a car, code).doc
- tvb英语歌曲(TVB English songs).doc
- t型龙骨矿棉板吊顶现场施工工法(The construction method of T type ceiling keel mineral field).doc
- t恤diy(T恤DIY).doc
- ubuntu9详细安装过程文档(ubuntu9详细安装过程文档).doc
- ubuntu下ftp服务器的配置(Configuration of FTP server under Ubuntu).doc
- uc装甲资料(月钛.超高张力钢.高达尼姆合金)(UC armor material (lunar titanium. Ultra high tensile steel. Up to Nimes alloy)).doc
- udp_ip校验和计算(Udp_ip checksum calculation).doc
- udp校验和算法(UDP checksum algorithm).doc
- uboot启动感悟(Uboot startup sentiment).doc
- ugcam所以加工方法的介绍(UGCAM so the introduction of processing methods).doc
文档评论(0)