- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建造师房屋建筑实务案例题汇编4(Case study of a first class builders housing construction case 4)
一级建造师房屋建筑实务案例题汇编4(Case study of a first class builders housing construction case 4)
14. a construction unit received a project through competitive bidding. Both parties signed the contract price of the project, its main contents are: (1) the project cost is 8 million yuan, the main material costs accounted for the proportion of construction output value is 70%; (2) advance preparation paragraph 25% of the project cost; (3) the project schedule monthly calculation; (4) warranty gold project construction cost 5%, half a year warranty;
(5) the material price adjustment according to the provisions of the actual rise, finally each month was 10%. The actual output value of each month to finish as shown in table 2.
The engineering actual output table 2
Month
One
Two
Three
Four
Five
Complete output
Eighty
One hundred and thirty
Two hundred and fifteen
One hundred and eighty
One hundred and ninety-five
The problem:
(1) what are the main contents of the bid decision of enterprises?
(2) advance the project, how to point?
(3) the project from 2 to April, what are the monthly disbursement of project funds accumulated projects? How much?
(4) in May for the completion of the project settlement, what is the total cost of the project shall meet the engineering payment? How much is it?
Notes: (1) a: bidding decision of enterprise includes two main aspects: one is to bid the project selection; two is the project bidding decision. The former is from the perspective of enterprise, analysis of internal conditions and competition environment based on the consideration for the realization of business objectives; the latter is a specific project bidding, called its project bidding decision. Project bidding decision includes project cost estimation and decision making bidding decision two contents.
(2): Payment: 800 * 25%=200 million.
From the point of: 800 - 200170%=514.3 million.
(3): February allocated 1 million 300 thousand yuan for projects, total project 80+130=210 million yuan.
March
您可能关注的文档
- 诊断学辅导试题--腹部(a1型题)(Diagnostic counseling -- abdominal (A1 problem)).doc
- 诊断实验答案(Diagnostic test answer).doc
- 诊断选择题(Diagnostic choice).doc
- 诊断基本检查(Basic diagnostic examination).doc
- 诗人约翰·弥尔顿简介(A brief account of poet John Milton).doc
- 诗歌朗诵中的声音之美(The beauty of sound in poetry recitation).doc
- 语数英试卷和答案(Number of English papers and answers).doc
- 语文周记(Chinese weekly).doc
- 谈久病成医(我的过敏性鼻炎治好了)(About the woman (I'm allergic rhinitis cured)).doc
- 质量通病防治(Quality defects prevention).doc
- Unit 6 Get Close to Nauture Lesson 22 -课件-2025-2026学年度北京版英语四年级上册.pptx
- Unit 7 Be Together Lesson 23 -课件-2025-2026学年度北京版英语四年级上册.pptx
- 2025食品饮料行业AI转型白皮书-2025食品饮料行业数智化转型领先实践.pdf
- Unit 7 Be Together Lesson 24 -课件-2025-2026学年度北京版英语四年级上册.pptx
- Unit 7 Be Together Lesson 25 -课件-2025-2026学年度北京版英语四年级上册.pptx
- Unit 7 Be Together Lesson 26 -课件-2025-2026学年度北京版英语四年级上册.pptx
- 2025年广州体育职业技术学院单招职业倾向性考试题库完美版.docx
- 软件公司员工考勤异常处理.doc
- 2025年土地登记代理人之土地登记相关法律知识题库500道及完整答案【有一套】.docx
- 2025年四平职业大学单招职业适应性考试题库含答案.docx
文档评论(0)