- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国水电老挝(China Hydropower Laos)
中国水电老挝(China Hydropower Laos)
Chinas hydropower station, Laoss first BOOT hydropower station, was officially put into commercial operation
08 2010 06 July 10:34 source: interactive (1) [font =] small: large decreases in new network on 6 August, according to the SASAC website news, August 1st, the national electric power company announced China Hydropower Group in Laos, Laos hydropower market on the first BOOT project - South Laos hydropower 1-2 the two station project total installed 100 thousand KW unit officially put into commercial operation.
In July 26th, South Laos successfully passed the 72 hour test run of two units of 1-2 hydropower station, power station facilities run the Lao national two units of South 1-2 hydropower were examined, and confirm the South 1-2 power plant and power station all debugging the power generation facilities meet the requirements of the technology of 1-2 hydropower station in South to in August 1, 2010 officially put into commercial operation.
SOUTH LAOS 1-2 hydropower station is the first BOOT in Laos hydropower project on the market. Since the project started in September 1, 2007, completed a total of 2 million 930 thousand cubic meters of earth and stone backfill 2 million 100 thousand cubic meters, 250 thousand cubic meters of concrete pouring, steel fabrication and installation of 16 thousand tons, more than 2.9 anchor root, curtain grouting and consolidation grouting of 46000 meters, 20000 square meters of backfill grouting structure fabrication and installation of 3265 tons of engineering quantity, quality and efficient completion of the stage goal well, the early realization of the target node in Laos, the market established a good reputation, to further improve the China Hydropower Group in Laos market competitive advantage for the future in Laos market sustainable development has a very important significance.
Chinese hydropower completed 1-2 hydropower station in Laos South Main project
Source: China Securities News, 20
您可能关注的文档
- 中国历代文学作品选重点作品(Selected works of Chinese literature in past dynasties).doc
- 中国历代状元名榜(List of Chinese champion figures in past dynasties).doc
- 中国历代王朝对外三大胜仗三大败仗(Chinese Dynasties three three foreign victory defeat).doc
- 中国历代帝王陵寝简表(Chinese emperors mausoleum table).doc
- 中国历代王朝灭亡的原因(The reasons for the collapse of Chinese Dynasties).doc
- 中国历代王朝皇帝表(List of Chinese emperors).doc
- 中国历代皇帝(南北朝)(Chinese emperors (Northern and Southern Dynasties)).doc
- 中国历史100位皇帝一句话总结(A summary of the 100 emperors in Chinese history).doc
- 中国历代赌博奇观(Gambling wonders of China).doc
- 中国十大考古发现(Ten archaeological discoveries in China).doc
文档评论(0)