- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
五星级酒店宾馆智能化系统设计要点(Key points of intelligent system design for five star hotel)
五星级酒店宾馆智能化系统设计要点(Key points of intelligent system design for five star hotel)
The design of the five star hotel intelligent system
According to the research on the design key points are as follows - parts of the country and participate in the hotel design, hotel intelligent system engineering construction, comprehensive hotel intelligent systems engineering major intelligent subsystem:
First, the principle of design and construction
1. intelligent system design and matching the five star hotel.
2. intelligent system design should be complete, advanced, practical and economical.
The actual situation of the 3. intelligent system design and project construction site to adapt.
4. intelligent system selection of equipment brand is the mainstream, mature, safe and reliable.
5. grade according to the standard of intelligent building design.
Two, intelligent subsystem configuration
According to the actual need, five star hotels should set the following intelligent subsystems:
And 1. automatic fire alarm linkage control system (by electrical trades)
2. construction equipment monitoring system
3. communication network system
4. computer network system
5. hotel management system
6. integrated wiring system
7. security system
8. smart card system
9. electronic lock management system
10. satellite and cable TV system
11.VOD VOD system
12. public broadcasting system
13. multimedia conference system
14. intelligent lighting control system
15. intelligent integrated system
Room 16.
17.UPS power supply system
18. lightning protection and grounding system
The design of each subsystem, three points
2. construction equipment monitoring system (saving energy and saving management cost to do the building management automation)
(1) due to the five star hotel is central air-conditioning, in order to strengthen the management of mechanical and electrical equipment and energy saving, shall be equipped with construction equipment monitoring system.
(2) the BA system tends to use communication
您可能关注的文档
- 为格网因子正名【原创】(Name the grid factor [original]).doc
- 为民办实事情况通报——城区学校及农村中学公寓楼建设(Report on the actual situation of private sector -- Construction of apartment buildings in urban, school and rural secondary schools).doc
- 为父母立碑祭文_孙中_新浪博客(Built in _ sun _ Oration Sina blog for parents).doc
- 为祖国喝彩(Cheer for the motherland).doc
- 为苏州四星级宾馆策划的主题活动(实战)(Theme activities for planning four star hotels in Suzhou (actual combat)).doc
- 为资本家打工者阶层分析(Class analysis for capitalists).doc
- 为译而生(Born for translation).doc
- 为设计动画而画的简笔绘画(A simple pen painting for the design of animation).doc
- 主井10kv变电站操作规程(Operation regulation of main shaft 10kV substation).doc
- 主3基础修(Main 3 basic maintenance).doc
文档评论(0)