五星级酒店宾馆智能化系统设计要点(Key points of intelligent system design for five star hotel).doc

五星级酒店宾馆智能化系统设计要点(Key points of intelligent system design for five star hotel).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
五星级酒店宾馆智能化系统设计要点(Key points of intelligent system design for five star hotel)

五星级酒店宾馆智能化系统设计要点(Key points of intelligent system design for five star hotel) The design of the five star hotel intelligent system According to the research on the design key points are as follows - parts of the country and participate in the hotel design, hotel intelligent system engineering construction, comprehensive hotel intelligent systems engineering major intelligent subsystem: First, the principle of design and construction 1. intelligent system design and matching the five star hotel. 2. intelligent system design should be complete, advanced, practical and economical. The actual situation of the 3. intelligent system design and project construction site to adapt. 4. intelligent system selection of equipment brand is the mainstream, mature, safe and reliable. 5. grade according to the standard of intelligent building design. Two, intelligent subsystem configuration According to the actual need, five star hotels should set the following intelligent subsystems: And 1. automatic fire alarm linkage control system (by electrical trades) 2. construction equipment monitoring system 3. communication network system 4. computer network system 5. hotel management system 6. integrated wiring system 7. security system 8. smart card system 9. electronic lock management system 10. satellite and cable TV system 11.VOD VOD system 12. public broadcasting system 13. multimedia conference system 14. intelligent lighting control system 15. intelligent integrated system Room 16. 17.UPS power supply system 18. lightning protection and grounding system The design of each subsystem, three points 2. construction equipment monitoring system (saving energy and saving management cost to do the building management automation) (1) due to the five star hotel is central air-conditioning, in order to strengthen the management of mechanical and electrical equipment and energy saving, shall be equipped with construction equipment monitoring system. (2) the BA system tends to use communication

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档