作业指导书-----轻钢龙骨石膏板吊顶施工方案及工艺(Construction guide - light steel keel, gypsum board ceiling construction program and process).docVIP
- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
作业指导书-----轻钢龙骨石膏板吊顶施工方案及工艺(Construction guide - light steel keel, gypsum board ceiling construction program and process)
作业指导书-----轻钢龙骨石膏板吊顶施工方案及工艺(Construction guide - light steel keel, gypsum board ceiling construction program and process)
Work instructions, the suspended ceiling construction scheme and technology
(a) material purchase requirements
1. light steel skeleton of U type and T type skeleton skeleton two, and press the load points on the people and not the man.
The 2. main pieces of light steel frame for large, small keel; accessories hanger, connector, plug hanging.
3. parts: boom. Flower blue screw. Nail. Tapping screws.
4. according to the design specifications with various aluminum cover panel. Pressure or pressure on every plastic strip, the variety of materials. Quality should meet the design requirements specifications.
5.: according to the material properties of binder should be selected before use as bond test.
(two) main equipment
The main equipments include: chainsaw, tooth free saw, nail gun, hand, hand plane, pliers, screwdriver, wrench, feet, ruler, steel level etc..
(three) operating conditions
1. construction, should be in the cast-in-place concrete floor slab or precast concrete floor, according to exit requirements according to the embedded, Phi 6~ Phi 10 reinforced concrete boom, exit request according to location of the pre buried steel keel hanger, general spacing why 900~1200mm.
2. when the ceiling rooms for brick masonry wall column, in elevation along the ceiling around the wall and column, masonry pre buried anticorrosive wood block, along the wall column spacing 900~1200mm, each side should be no more than two pieces of brick buried shot.
3. after the installation of pipeline ventilation and ceiling, to determine a good light, and all kinds of open vent holes.
4. kinds of materials all ready facilities.
The 5. ceiling panel before installation should be finished wall, wet operation project.
6. a roof construction platform shelf.
7. ceiling light steel skeleton in the large area before construction, should do model, the roof arch, light tank, struc
您可能关注的文档
- 什么是国学(What is Chinese culture).doc
- 什么是宿便(What is the stool).doc
- 什么是封建与封建被滥用之后(What is the abuse of feudalism and feudalism).doc
- 什么是数学模型与数学建模(What are mathematical models and mathematical modeling).doc
- 什么是天堂(What is heaven).doc
- 什么是易拉宝(What is ilabo).doc
- 什么是暴雨(What is a rainstorm).doc
- 什么是按揭贷款(What is a mortgage loan).doc
- 什么是梅花拳的真文大武(What is really the plum flower boxing dawu).doc
- 什么是比特率(What is bit rate).doc
- 上海海洋大学《海洋环境分析技术》课件-21化学发光分析法.pdf
- 上海海洋大学《海洋环境分析技术》课件-20分子荧光分析法.pdf
- 上海海洋大学《海洋环境分析技术》课件-22色谱分离过程.pdf
- 上海海洋大学《海洋环境分析技术》课件-25气相色谱仪与固定液.pdf
- 上海海洋大学《海洋环境分析技术》课件-24色谱定性定量方法.pdf
- 上海海洋大学《海洋环境分析技术》课件-26气相色谱检测器.pdf
- 上海海洋大学《海洋环境分析技术》课件-29液相色谱固定相与流动相.pdf
- 上海海洋大学《海洋环境分析技术》课件-27气相色谱分离条件的选择.pdf
- 上海海洋大学《海洋环境分析技术》课件-28液相色谱仪器与类型.pdf
- 上海海洋大学《海洋环境分析技术》课件-3 原子光谱和分析光谱.pdf
文档评论(0)