制冷机房操作规程(Operating rules of refrigerating room).docVIP

制冷机房操作规程(Operating rules of refrigerating room).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
制冷机房操作规程(Operating rules of refrigerating room)

制冷机房操作规程(Operating rules of refrigerating room) 1, purpose: Scientific and safe operation of refrigeration equipment, so that the refrigeration system in the best running state, to ensure the quality of cold processing and refrigeration products, to ensure the smooth progress of production. 2, scope of application: Applicable to the operation and management of all refrigeration equipment in the refrigeration plant. 3, responsibilities: The chiller is responsible for the operation, adjustment and hidden trouble handling of the refrigeration system and auxiliary equipment, and records. 4, procedural requirements: 4.1 operation rules of single stage screw type ammonia compressor 4.1.1 boot preparation 4.1.1.1 first to see whether the listing workshop records, understand the reasons of shutdown and parking time, if the accident or the machine repaired regularly, should check whether the repair and commissioning; if need normal shutdown, then the preparation work is completed, according to the normal procedures to start the compressor and put into operation. 4.1.1.2 check whether the valves of high and low pressure piping systems and equipment are in working condition. A, from the compressor high-pressure discharge line to the condenser, the valve from the condenser to the auxiliary ammonia collector and the high reservoir is opened. B check whether the inlet and outlet valves of the low pressure circulating liquid storage tank are in full open state and whether the manual delivery valve is in closed state. The control valve of the safety valve on the C and the equipment shall be in the open state, with the condenser and the high pressure The liquid storage barrel, ammonia storage tank and high-pressure liquid storage barrel between the equalizing valve should be opened, pressure gauge valve, level gauge valve should be opened. D, check the oil cooler inlet and outlet valve, whether the inlet and outlet valves are opened. 4.1.1.3 check the liquid level and control of the

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档