- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路路基基本知识(Basic knowledge of Highway Subgrade)
公路路基基本知识(Basic knowledge of Highway Subgrade)
Basic knowledge of Highway Subgrade
Highway Subgrade
Highway subgrade is the foundation of the road, it bears itself rock weight and pavement weight, and to transfer the driving load by road is the main highway bearing. Highway subgrade is composed of width, height and slope three. The roadbed width depends on the level of road; subgrade height depends on the longitudinal slope design and terrain; subgrade slope depends on the geological and hydrological conditions, and the slope stability and economic factors such as the comparison and selection of cross section.
Highway roadbed
The roadbed is the foundation of the road, is part of the bottom of the surface of Subgrade under the range of 80cm, borne by the pavement load. The structure is divided into road bed (0 ~ 30cm) and road (30 ~ 80cm) two. The road directly laid on the roadbed on. Therefore, on the road, especially the road bed soil, particle size, degree of compaction has strict requirements, must be uniform, dense, high strength, no loose and soft elastic phenomenon. The
The excavation of roadbed roadbed, must be smooth and dense, with heavy compaction compaction to the specified.
In order to ensure the pavement structure layer of uniform thickness and drainage, road surface must be made consistent with crown slope pavement.
Highway embankment
The embankment fill subgrade is higher than the original ground, its role is to support the roadbed and pavement. Following the road embankment is divided into upper and lower two layers:
The following road embankment bottom 80 ~ 150cm within the scope of the filling part.
Under the embankment embankment fill the following parts.
Highway Subgrade Compaction
After filling mining, handling, the original structure has been destroyed, leaving many pores between soil mass, under load, may appear uneven or excessive subsidence, collapse and sliding, so the subgrade must be compacted; cutting surface and embankment on soil layer
您可能关注的文档
- 光缆熔接(Cable splicing).doc
- 光钎接口(Brazing interface).doc
- 光驱不读盘修理(CD-ROM does not read disk repair).doc
- 光驱图标找回,搜索栏无光标(CD-ROM icon to retrieve, search column without cursor).doc
- 克林霉素与地塞米松配伍禁忌(Incompatibility between clindamycin and dexamethasone).doc
- 克拉玛依年鉴_油田公司勘探公司_垂直钻井系统及无风险钻井系统应用(Exploration company _ vertical drilling system of Karamay Oilfield Company _ Yearbook and no risk of drilling system).doc
- 克莱斯勒铂锐汽车配件价格(The Chrysler auto parts prices).doc
- 克隆出租车案引发的法条矛盾和法理冲突(The conflict of law and the conflict of laws in the case of cloning taxi)(Conflict and the of laws in case of cloning of (The conflict the law taxi) caused by the clone taxi case).doc
- 克里斯托弗·马洛(Christopher Marlow).doc
- 克里昂将你的力量聚焦在那些充满更高能量的新体验里!(You focus your energies on new experiences that are full of energy!).doc
文档评论(0)