- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中铁局集团隧道施工测量方案(Tunnel construction survey plan of China Railway Bureau Group)
中铁局集团隧道施工测量方案(Tunnel construction survey plan of China Railway Bureau Group)
Tunnel construction survey plan of China Railway Bureau Group
Tunnel construction survey plan of China Railway Bureau group:
General situation of Engineering
(a) overview of the project, the two phase of the project is lijiafang tunnel in a tunnel to the original lijiafang project on the west side of the new tunnel, one-way two lane tunnel, the design speed of 60km/h. It is basically parallel with the first phase of the project, and the spacing between the two holes is 30 - 35m. The tunnel pile No. yk0+875~yk2+140, full length 1265m; plane line: straight line, r=1500 right determination and elevation of midline lofting lining section. And mark the elevation position of the special part. After the completion of the tunnel lining construction, the lining section shall be made out of the centerline and the elevation composite, and the clearance section of the lining shall be measured.
Through the determination and adjustment to ensure the construction progress and improve the construction environment error, the project Department of the import and export of two parties to consider the export of tunneling, construction conditions are relatively good, is expected through the point of yk1+400, the theory of coordinate yk1+400 as the breakthrough point, both ends of the wire are measuring the point coordinates of the measuring point, lateral error through vertical and horizontal angle error to calculate the azimuth and elevation error through error.
Tunnel through error
Formula: the influence of M external control network error on transverse through error;
M1 - the influence value calculated by the import; M2 - the influence value calculated by the exit; m beta - the theoretical height error when the central line is set by the control point;
After the tunnel is through, the actual through error of the central line and the elevation should be adjusted in the unlined lining area. The excavation and
您可能关注的文档
- 专栏一步到位vs逐步达成(Column one step in place, vs gradually reached).doc
- 专访友邦中国ceo蔡企业培训强新高管团队亮相 友邦祭出a计划(Strong training Chinese CEO Cai interview the new executive team debut AIA AIA resorted to a plan).doc
- 专访沈阳造3d打印机(Interview with Shenyang made 3D printer).doc
- 专访顾长卫电影里有企业培训我对生命的理解(Interview with Gu Changwei there are enterprises in the film training my understanding of life).doc
- 专题与热点4 原子结构与元素周期律.(Topic and hotspot 4 atomic structure and periodic law of elements).doc
- 专题五语段压缩(Topic five language segment compression).doc
- 中人商城公开课频道一周热销榜(2010.12.20-12.24)(Chinese People Mall open class channel weekly list (2010.12.20-12.24)).doc
- 中介公司广告词(Intermediary company advertising words).doc
- 中兴ag设备脚本范例(Examples of ZTE Ag device scripts).doc
- 中兴v880 瘦身方法,永久root,除去定制,增加运存!(ZTE v880 downsizing method, permanent root, remove customization, increase storage!).doc
文档评论(0)