- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻孔灌注桩断桩(Bored pile; broken pile)
钻孔灌注桩断桩(Bored pile; broken pile)
Key words: practice quality, drilling hole, bridge defect, perfusion treatment paper
Treatment practice of quality defects of bored pile in Bridge
Abstract in this paper combined with the engineering practice of bridge pile defect formation analysis, and several successful processing methods are introduced for the peers.
Keywords in Bored Pile in quality defects in treatment
With the rapid development of Chinas transportation infrastructure construction, as a kind of bored pile foundation form with its strong adaptability, moderate cost, simple construction and other features will be widely used in highway bridges and other engineering fields. Bored pile belongs to concealed work, but due to the factors affecting the quality of the pile, the construction process each link must be strict requirements, there must be a detailed consideration of the various factors, such as geological factors, drilling process, wall, reinforcement cage floating, concrete preparation and perfusion. If the slightest mistake or measures are not strict, will produce quality accident in bored, small hole collapse, necking loose, large broken pile scrap, causing heavy losses to state property, until the time and have an adverse effect on the quality of the whole project. According to the October 1996 Beijing national survey shows that pile dynamic academic exchanges on statistical data in the pile were detected in about 5 ~ 10% is defective, the defects of the bored pile is as high as 14.7% rate of bad geological; statistical data indicates that the pile foundation test from 1990 to 1998 in Henan Province as the foundation pile breaking rate 5.6% (other defective statistics). Therefore, we must attach great importance to and strictly control the construction quality of bored piles, try to avoid accidents and reduce the losses caused by accidents, so as to facilitate the smooth progress of the project. This paper summarizes the construction of bored piles and t
您可能关注的文档
- 自学吉他三月通 目录(Self taught guitar catalog March).doc
- 自学英语如何选择和使用词典(Teach yourself English how to choose and use a dictionary).doc
- 自己总结的新生儿上户口经验(I summarize the experience of newborn residence registration).doc
- 自动驻车(Automatic parking).doc
- 自己搜集的预算安装快速入门的知识希望对大家有帮助(Collect your own budget, install fast start knowledge, we hope to help).doc
- 自己的开场白(My opening remarks).doc
- 自律的重要性(The importance of self-discipline).doc
- 自我介绍综合材料(Self introduction materials).doc
- 自我实现(Self-realization).doc
- 自我介绍要求(Self introduction requirements).doc
- 钻孔灌注桩施工质量问题及防治措施(Construction quality problems and prevention measures of Bored Piles).doc
- 钻孔灌注桩施工(Bored pile construction).doc
- 重庆鹅公岩长江大桥(Chongqing Goose Rock Yangtze River Bridge).doc
- 钻孔灌注桩混凝土施工中导管堵塞的原因(Causes of pipe blockage in concrete construction of Bored Piles).doc
- 钻探工程复习题(Drilling engineering review).doc
- 重装机兵2攻略(2 Raiders of heavy machine soldiers).doc
- 钻石知识普及(Diamond knowledge).doc
- 银手镯变黑的相关知识(The knowledge of black silver bracelets).doc
- 银杏能抗痴呆未有定论(Ginkgo can fight dementia, inconclusive).doc
- 银河新闻联播(Galaxy News Network).doc
文档评论(0)