- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2006年上半年电力安全工作总结(Summary of power safety work in the first half of 2006)
2006年上半年电力安全工作总结(Summary of power safety work in the first half of 2006)
First, the first half of the completion of the production safety indicators:
No minor injuries or more personal accidents. No rural workers seriously injured and above personal accident. No accident occurred at two or more substations at 110Kv. The accident of main equipment without personnel responsibility. No fire accident or major traffic accident with the same responsibility or above. There is no mal operation accident, 10KV or more malignant misoperation accident, 35KV or more misoperation accident. No accident occurred in power transmission and transformation. There were no such obstacles as power transmission, but there were 1 transmission line accidents, 3 kinds of transmission lines obstruction and 18 agricultural accidents.
In the first half of the year, 136 kinds of work tickets and second tickets for 821 kinds of work were carried out, with a pass rate of 100%. The first line of work tickets (499 licenses) and second tickets for the 90 lines were adopted, with a pass rate of 100%.
The first half of the company did not occur assessment accident, to May 31st, the companys security days for 2554 days, the first 100 days of this year to achieve safe no accident record.
1, 1 to May, 10KV agricultural accidents occurred 18, the same period last year, a total of 17 agricultural accidents. There were 3 kinds of obstacles in the lines of 35KV and above, 2 times last year, and 1 accidents in the transmission line.
2, the transmission line accident 1 times: April 25th 17:25220kv: Xinzheng bridge line grounding distance protection tripping, no coincidence; fault is B phase, measuring the distance of 16.89 km bridge becomes 220kV; Zheng Lu became the power loss. 110kV Qinglong, Liu Shu became the power loss. The variable loss of power 35kV Zheng, cast from the Qinghe line successfully changed the estuary. 18:24220kv Xinzheng 2918 line trial delivery. After the line inspection, found 220kV, Xinzh
您可能关注的文档
- 关注空气质量(Focus on air quality).doc
- 关注穿琥宁、炎琥宁注射剂的安全性问题(Pay attention to the problem of safety, Chuanhuning Injection Yanhuning).doc
- 关注领导干部心理健康(Pay attention to the mental health of leading cadres).doc
- 典型病例(临床)(Typical cases (clinical)).doc
- 典型问题家庭的七大共性(Typical problems; the seven general characteristics of the family).doc
- 六味地黄丸的作用可大了 不看可惜了(Six, the role of rehmannia pill can be large, do not look at the pity).doc
- 典型零件cam应用(Typical parts CAM application).doc
- 典故大全·植物·花卉(Encyclopedia of plants and flowers).doc
- 冠心病的abcd(ABCD of coronary heart disease).doc
- 冠心病食疗方(Coronary heart disease dietotherapy prescription).doc
- 就职保密协议.doc.docx
- 劳动合同范文.docx
- 2024工程项目部安全生产治本攻坚三年行动实施方案.docx
- 简约风读书分享会PPT模板.pptx
- 实施指南《GB_T41612 - 2022 页岩气井产量预测技术规范实施指南》.docx
- 实施指南《GB_T41632-2022 合成有机酯绝缘液体实施指南》.docx
- 实施指南《GB_T41655-2022 复合覆层检测标准解读》.docx
- 实施指南《GB_T41657-2022 胶粘带抗刺穿性能测定解读》.docx
- 实施指南《GB_T41666.3-2022地下无压排水管网非开挖修复用塑料管道系统第3部分:紧密贴合内衬法》实施指南.docx
- 实施指南《GB_T41923.7-2022机械产品三维工艺设计第7部分:发放要求》实施指南.docx
文档评论(0)