- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年上半年工作总结(Summary of work in the first half of 2011)
2011年上半年工作总结(Summary of work in the first half of 2011)
Summary of work in the first half of 2011
In accordance with the work requirements of the municipal Party committee and the municipal government in coordinating urban and rural development, in accordance with the work arrangements of the town Party committee and the government, the construction of the central town has been steadily promoted, and the construction potential has been well developed. Now, the work is summarized as follows:
First, the work carried out
1, high standard, do a good job town planning and construction. West Town township planning in accordance with the requirements of this year, the town finance invested nearly 3 million yuan to hire a city planning and Design Institute of design and construction engineering project budget of West Town, the relevant project approval information has been submitted to the municipal development and Reform Commission, the project is the construction of road vibration budget 10 million 235 thousand yuan, the construction of road water budget of 25 million 5 thousand and 800 yuan, the construction of commercial road engineering budget 15 million 979 thousand and 200 yuan, the public park construction budget 50 million yuan, Gong family residential placement, resettlement area, West Tong Lin resettlement district two three settlements infrastructure construction project budget 45 million yuan, started in June 28th, Chongqing West Town section of Avenue reconstruction project investment amounted to 100 million yuan, a total investment of 40 million yuan, the garden.
2, around the ecological Livable City West, West, to improve the township greening and resettlement residential facilities construction, at the beginning of the town of financial investment of 10 million yuan, the greening of West Avenue, New South Road, West Industrial Zone, Chong Jiang Chong Jiang residential placement, residential placement, placement of small Tong Lin area a completed water elect
您可能关注的文档
- 分布式光伏可免费入网 分析称或将打破电网垄断(Distributed photovoltaic free access analysis, or will break the monopoly of the grid).doc
- 几个标准判断黑痣是否会癌变(Several criteria to determine whether cancerous mole).doc
- 分析美国的非税收入和预算外基金(Analysis of non tax revenues and off budget funds in the United States).doc
- 分立元件设计(Discrete component design).doc
- 分类英语(Classified English).doc
- 分葱栽培技术(Cultivation techniques of shallot).doc
- 列数2012年国内待建光伏电站(The number of columns to be built in 2012 the domestic photovoltaic power plant).doc
- 列车分类办法(Classification of trains).doc
- 刘一秒女人强则国强(Liu Yimiao strong woman).doc
- 刘一秒消化智慧(A second digestion of wisdom).doc
文档评论(0)