- 1、本文档共37页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公司宣传演示1
GCP Market Area A Unique Structural Member Quality Control High Strength Concrete High Density Concrete Low Porosity Concrete Uniformity of Concrete Uniform Wall Thickness Design Variations Length Adjustments Maximum Combined-Load Strength Corrosion Resistance Manufacturing Process Moving Segments to Storage Assembly Tensioning Prestressing Strands Tensioning Complete Stress Transfer Transportation Grouting Cylinder Piles Being Loaded on Barges Questions? Please Contact Don Theobald at dtheobald@ GCP occupies approximately 90 acres on the Industrial Seaway in Pass Christian on the Gulf Coast of Mississippi. We supply products from Houston, Tx to Apalachicola, Fl. From September of 1999 through August 2000 we have produced 179,650 LF of 12” square pile 613,636 LF of 14” square pile 305,703 LF of 16” square pile These three sizes account for 208 miles of pile. Assembled Form ready for spinning A spiral steel reinforcing cage is fabricated for each section. A completed spiral cage. Steel rods are attached to the end rings. Special rubber hose cover the rods to form the 1 3/8” ok In 1965 Hurricane Betsy destroyed cylinder piles installed in 1950 in Gulf of Mexico in . This Photo was taken in 1968. Close-up of damaged pile shows that corrosion did not progress beyond concrete fracture line for both prestressing tendon and spiral. Assembled Form being placed into pile spinner. Form in Spinner An operator moves the Charger with concrete hopper and auger attached in and out of the slow spinning form depositing the “0” slump concrete. External Vibrators are utilized against the form while a roller compactor is used to screed toe pile to a uniform thickness against the end rings. * * Manufacture of Spun Cast Concrete Cylinder Piles by Don Theobald Vice President / Engineering Gulf Coast Pre-Stress, Inc Precast/Prestressed Concrete -- The Solution of Choice GCP Plant Facilities Welding Spiral Cage Completed Spiral Cage End Rings 54 i
您可能关注的文档
最近下载
- 2024官方兽医考试更新题库及答案.doc
- 八年级数学平方差公式20题(含答案).doc
- 市政工程分部分项划分表(全套)最新版.docx
- (中职)Access数据库应用技术教案课题: 任务6 创建操作查询.docx
- 通达信筹码峰左右画线主图通达信指标公式源码.docx
- 《GBT 24421.2-2023服务业组织标准化工作指南 第2部分:标准体系构建》最新解读.pptx
- GB 55009-2021 燃气工程项目规范.pdf
- 法医临床学试题.docx VIP
- 河北对口单招第十类职业适应性测试(计算机)-第一章计算机基础知识课件ppt.pptx VIP
- 九年级语文下册 第8课《假如我有九条命》课件 上海五四制版.ppt VIP
文档评论(0)