- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
幕墙测试计划书
2. FIELD WATER TESTING现场试验
2.1 Field water testing shall be carried out periodically during curtain wall installation.在幕墙安装期间定期进行现场喷淋试验。
Provide 3 successful water tests of each typical wall type. Locations to be selected by architect.
每种外墙安装期间定期进行现场喷淋试验。
All termination conditions, flashing to windows frames behind aluminum and cladding panels, coping/external balustrade shall be 100% tested.
所有收口位置与窗框相连的,在铝板后面的泛水板都需要100%的测试。
Should problems arise, the Architect may instruct that further testing be carried out.
如测试当中有任何问题出现,工程师可要求增加作实验范围。
The test shall be conducted strictly in accordance with AAMA-501.2
测试过程应严格遵循测试过程应严格遵循AAMA-501.2
Test area shall be at least two-story high and three-panel wide.This area should include all typical horizontal and vertical joints.The water shall be applied using a Type B-25,#6.030 brass nozzled with 1/2” FPT as manufactured by Monarch Manufacturing Works.The nozzle shall be used with a 3/4” garden hose.the water flow to the nozzle shall be adjusted to produce 30 to 35 psi water pressure.The nozzle shall be moved slowly back and forth above the joint,at distance of 1 ft from it,for a period of 5 minutes for 5 ft of joint.
测试区域至少为2层楼高,3个板宽,包括所有典型的横向和竖向接缝。淋水应采用铜喷嘴,型号如同Monarch Manufacturing Works Monarch Manufacturing Works生产的Type B-25,#6.030。喷嘴后接喷嘴后接3/4英寸的水管,水压应达30~35psi。
2.2 Gutter Test水槽测试
Verify during construction that water leakage and condensation are effectively collected and drained to the exterior. Test internal gutters for every floor by temporarily plugging weep holes and filling with water. After a minimum of fifteen(15) minutes,inspect for water leakage. Correct deficiencies and retest until successful tests are achieved. Remove weep hole plugs after testing.All gutters are to be clean and free of debris prior to installing additional material that would prevent access at a later time. Gutters shall be 100% tested.
在施工期间须检查渗漏雨水和冷凝水是否能够被完全排除室外。用临时堵住泄水孔并在内部水槽中灌水的方法来检查每一层楼的内部水槽的防渗漏性能。在保持15分钟以后,检查渗水状况。有缺陷的地方需要整改并重新测试直到测试成功。确
您可能关注的文档
- 精品常用变频器自整定.doc
- 精品常用光纤接头类型[图文].pdf
- 精品常用商贸英语缩写.doc
- 精品常用塑料总结.doc
- 精品常用型钢规格表.doc
- 精选常用工艺术语英语汇总.doc
- 精品常用机房屏蔽工程(电磁屏蔽室)技术方案模板.doc
- 精品常用塑料牌号用途.doc
- 精品常用物体折射率表 IOR 参数表.docx
- 精品常用电器华师大版.ppt
- 2023咸阳职业技术学院招聘笔试真题参考答案详解.docx
- 2023四川化工职业技术学院招聘笔试真题及参考答案详解.docx
- 2023哈尔滨职业技术学院招聘笔试真题及参考答案详解.docx
- 2023商洛职业技术学院招聘笔试真题及答案详解1套.docx
- 2023呼伦贝尔职业技术学院招聘笔试真题参考答案详解.docx
- 2023南阳农业职业学院招聘笔试真题参考答案详解.docx
- 2023天津公安警官职业学院招聘笔试真题带答案详解.docx
- 2023年上海电机学院招聘笔试真题参考答案详解.docx
- 2023年四川艺术职业学院招聘笔试真题参考答案详解.docx
- 2023安徽体育运动职业技术学院招聘笔试真题及答案详解一套.docx
文档评论(0)