Hoisting process
1, the lifting process: the location and elevation, fixed anchor bolt inspection, elastic line, main steel component installation (such as: steel column and beam etc.) once installed (such as steel purlin etc.) to paint to completion
2, the first hoisting construction organization on the basis of the retest, including his length of anchor bolt, anchor bolt displacement deviation of the center line of the base line, anchor spacing, foundation elevation for processing before lifting the u
您可能关注的文档
- 内分泌系统总论(Endocrine system overview).doc
- 内分泌紊乱状态(Endocrine disorder).doc
- 喷淋管径所带喷头数目探讨(Discussion on the number of nozzles with spray pipe diameter).doc
- 女人一生能承受几次流产(A woman can suffer several miscarriages in her life).doc
- 女生写给男朋友的——————看过后突然很理解女朋友了~(The girl wrote to her boyfriend - - after reading, she suddenly understood her girlfriend).doc
- 尼泊尔旅游资料(Nepal travel information).doc
- 廉政(The).doc
- 掐珠念 追顶念 观想念 随息念等应慎用(Pinch bead read, chase top read view, miss with interest read, should be used with caution).doc
- 批量更新sql_批量update_sql(Batch update sql_ batch update_sql).doc
- 普通公路绿化规划.doc(普通公路绿化规划.doc).doc
原创力文档

文档评论(0)