- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电工施工工艺(Electrical construction technology)
电工施工工艺(Electrical construction technology)
This article is contributed by xxs412
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Electrical construction technology
2-1 electrical process: electrical process: 2-1-1 approach must examine the original leakage protection work is reliable, check whether the number and capacity of the original air switch can satisfy the requirements, check TV, cable, telephone and 2-1-2 into the family way. According to the design drawings and customer requirements to determine the switch, socket, lamp position 2-1-3. Cut wire slot and switch, socket, wire box hole, pipe threading fixed line box and the connecting wire. Check the insulation resistance of each branch line. 2-1-3-1 chisel trough with a cutting machine cutting method. The installation of 2-1-4 lamps and the switch socket panel, for electricity experiments on each branch line. 2-2 power requirements system construction technology: requirements of power system construction technology:
2-2-1 distribution box installation location: should be installed in the ventilation easy position, convenient operation and maintenance daily, the box bottom height should be 1.8m. the original position of electric box usually do not shift, if you need to install a box over shift by the design, construction personnel to determine the construction scheme, construction personnel in the guidance. 2-2-2 check leakage protector and air switch: to inspect the leakage protection switch, leakage 30mA can cut off power supply, operation time should be less than or equal to 0.1S. number and capacity of the air switch were examined, such as can not meet the requirements must be replaced or added. Lighting must be controlled short-circuit protection device for a single set of poles and from the general switch leakage protection.
The vacuum cleaner air conditioning socket above 15A and the common 10A five
您可能关注的文档
- 生命能量肽(Life energy peptide).doc
- 生产部管理制度与考核办法(Management system and assessment method of production department).doc
- 生命线上的路基(The subgrade on the lifeline).doc
- 现浇坡屋面结构构造(Structure of cast-in-place pitched roof).doc
- 生姜(嫩)浸陈醋(Ginger (tender) soaked in vinegar).doc
- 生姜小百科(Ginger encyclopedia).doc
- 生姜的妙用42种(The use of 42 kinds of ginger).doc
- 生存游戏1.0僵尸屋(Survival game 1 zombie house).doc
- 生孩子要准备的物品(Something to be prepared for a child).doc
- 生孩子必看(Give birth to children).doc
- 电工考试3(Electrician's exam 3).doc
- 电工考试(Electrical examination).doc
- 电工证模拟考试试题(Electrical certificate simulation examination questions).doc
- 电工量计及检测技术 第一章(Chapter 1 electrical measuring and measuring technology).doc
- 电影剪片十四条戒律(The movie the fourteen commandments).doc
- 电工学电子技术复习资料带答案(Electrical engineering, electronic technology review materials, with answers).doc
- 电工资格复审题(Qualification review of Electrical Engineering).doc
- 电影剪辑技巧(Film editing techniques).doc
- 电影剪辑(Film Editing).doc
- 电影云图剧情简介及影评(A synopsis of film cloud pictures and their film reviews).doc
文档评论(0)