某汽柴油工程罐区工艺管道施工技术方案(Technical scheme for construction of technological pipeline in tank farm of a gasoline and diesel project).docVIP

某汽柴油工程罐区工艺管道施工技术方案(Technical scheme for construction of technological pipeline in tank farm of a gasoline and diesel project).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某汽柴油工程罐区工艺管道施工技术方案(Technical scheme for construction of technological pipeline in tank farm of a gasoline and diesel project)

某汽柴油工程罐区工艺管道施工技术方案(Technical scheme for construction of technological pipeline in tank farm of a gasoline and diesel project) A construction technical scheme of gasoline and diesel tank pipeline.Txt43 sails, not hanging on the mast, is a useless piece of cloth; the mast, dont hang up the sails, is a normal column; ideals into action is not action, with no reality whatever fog; but not ideal, is not only taking the end of the road. 44 often unlatched the door of success, as long as you are brave to push, it will suddenly open. The construction technology scheme of.Txt7 tank piping warm a gasoline and diesel engineering is a Durian of spring; warm is written on the face of the shadow; warming is bound to respond with warmth is strict in demands. The 8 respect is a spring, a spring, a give a person warm in the tonic Shuxin pill, a dose of inspiring contributed by jk770109. DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Technical scheme for construction of pipeline project in a gasoline and diesel engineering tank farm Establishment unit Compiling personnel Audit unit Auditor Approval unit Approver Date of preparation: date of preparation: two, 00, seven, June 25th order record I. General Provisions Two 、 construction preparation Three, process piping installation steps Four 、 pipe pressure test Five 、 anticorrosion of pipeline system Six, attached piping professional installation related table directory I. General Provisions: 1. Compiling Objective: in order to do well the installation engineering of tank farm technology pipeline, carry out technical control of pipeline construction process Make clear the specific quality standards and promote the smooth progress of the installation project. Special technical program for the installation of the process piping installation is specially developed. 2, compilation basis: A, industrial metal pipeline engineering construc

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档