船舶检验备忘录.docx

  1. 1、本文档共46页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
31,800 DWT Bulk Carrier AargauRemarks/defects hull 009 Date 25.04.2010……. =MASSOEL-MERIDIAN NOTES/REPLIES.~~~~~ =SHIPYARDS NOTES/REPLIES.ItemRemarks and Actions to be taken.言论和所采取的操作NOTES/REPLIES注释/回复Status001Shell plate requires fairing in 15 places 壳板需要 15 地光顺完成 (complete)Comp002Fore end shell plate requires fairing in 2 places前终壳板需要2地的光顺1 Rectified by yard003Aft shell plate stbd requires fairing in 6 places向前或向后端壳板需要6地光顺004Aft shell plate port requires fairing in 6 places005Ladder bolts in all areas require checking and where required fitted and tightened 在所有领域的梯子螺栓需要检查及所需装置并拧紧的方006Engine room corrugated bulk heads require the removal of temporary clamps and fixtures and ground引擎室波纹的批量头需要删除临时夹和固定装置和地面007No.2,3,4,5 Top side tanks and side tanks secondary steel work requires grindingNo.2,3,4,5 顶边舱及辅助钢工作需要磨边舱008Scallops from left and right side plates in all cargo hold ventilations should be closed从所有货物中的左侧和右侧板瑶柱举行通气应该被关闭完成 (complete)Comp009Engine room bottom inner plate requires welding and grinding引擎房间内底板需要焊接和磨削010Main deck frame marks to rectify要纠正的主甲板框架标记011Engine room some brackets have to many scallops, welding and grinding work required一些括号有焊接和磨工作所需的许多带子到机房Photo removed as defect complete see report 01.04.2010Comp012Engine room bottom plate, welding slag and temporary fixtures need to be removed and area cleaned引擎室底板焊接渣及临时固定需要删除和区域清理完成 (complete)Comp013Some strengthened brackets in way of engine room bulk head has bad scar marks, welding and grinding required一些加强的括号的引擎室大容量头的方式具有所需的标记,焊接和磨坏瘢痕完成 (complete)Comp014Engine room platform, fairing and grinding required in way of “S” door引擎室的平台光顺与磨削方式,"S"门的需要完成 (complete)Comp015Engine room platform longitudinal bulkhead has ventilation pipes opened in the incorrect place. Welding and grinding required引擎室平台纵向舱壁者已经在正确的位置打开通风管道。焊接和研磨所需完成 (complete)Comp016Main deck at frame 35 assembly joint and aft “P” deck need fairing框架 35 集联合和向前或向后的"P"甲板在主甲板需要光顺017Forecastle deck frame 208 transversal bulk head requires fairing舯甲板框架

文档评论(0)

153****9595 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档