装修容易漏的项(An item that leaks easily).doc

装修容易漏的项(An item that leaks easily).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
装修容易漏的项(An item that leaks easily)

装修容易漏的项(An item that leaks easily) 100 items that are easy to miss in the budget 1 the steam holes in the roof insulation roof of flat roof 2 embedded iron pieces in the stair railing 3 scaffold for paint and coating construction 4 precast slab beam concrete: plate, beam head concrete, transportation, installation 5 bored pile: drilled into the depth of rock (the municipal and highway quota projects contain a great gap in content) 6, the installation of indoor plumbing is easy to miss 7 extra high cost of outdoor pipe installation 8 angle steel fabrication and installation and material costs 9 the coefficient of unilateral soil waste in trench earthwork is easy to miss 10, the artificial coefficient of outbound soil forget to multiply 11 the list of cables and wires is only supplied with a net amount of work. In addition, the allowance, bending, loss and so on should be added to the group price 12 the base steel is easy to leak in the distribution cabinet installation list 13 water supply and drainage on the pipe installation list, the casing is easy to leak Plugging of 14 air duct through wall 15 control valve test pressure irrigation temporary short tube production and installation. 16, equipment installation, lifting equipment, elimination. 17. The bolts installed on the flanges in the process piping are non valuation materials. 18, installation part: high-rise building additional cost calculation of the base, including 6 or less than 20m of all labor costs. When the high-rise building is in accordance with the ultra high construction condition, the additional cost and the extra high increase fee of the high-rise building are calculated together. 19, roof line, cover plate! Mainly scattered parts! 20, some scattered small components, concrete easy to leakage; 21, the roof partition slot, especially when the overhead insulation layer, cement mortar leveling layer has a partition slot, and in the heat insulation board also need to do partition slot; 22, some of the

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档