- 9
- 0
- 约1.23万字
- 约 23页
- 2017-09-20 发布于河南
- 举报
西交《土力学及地基处理》在线作业(Online operation of soil mechanics and foundation treatment)
西交《土力学及地基处理》在线作业(Online operation of soil mechanics and foundation treatment)
Online operation of soil mechanics and foundation treatment
Total score: 100 test time: -
Radio examination
A multiple-choice question
Radio examination questions (40 questions, 80 points)
1. which of the following factors lead to soil slope instability: (1) the change of soil slope force; (2) the shear strength of soil decreases (3) the role of hydrostatic pressure; (4) the seepage force caused by the seepage of groundwater
A. (1) (2)
B. (3) (4)
C. (2) (3)
D. (1) (2) (3) (4)
Full marks: 2
2. when designing gravity retaining walls with only soil retaining function, the earth pressure shall be as follows
Calculation of active earth pressure for A.
B. passive earth pressure calculation
C. static earth pressure calculation
D. static water pressure calculation
Full marks: 2
3., the main feature of the deformation of the foundation of the frame structure is ().
A. sedimentation
B. settlement difference
C. tilt
D. local tilt
Full marks: 2
4. the strength of the soil refers to.
A. shear strength
B. compressive strength
C. tensile strength
D. flexural strength
Full marks: 2
5. the compressibility coefficient a of soil is larger, which means ()
The compressibility of A. soil is higher
The lower compressibility of B. soil is
The more smooth the C. e-p curve
The more smooth the D. e-lgp curve
Full marks: 2
6. when calculating the self weight stress, the soil layer below the water table should be adopted.
A. wet weight
B. saturation severity
C. effective weight
D. natural heavy
Full marks: 2
7. the particle size can be determined by sieving method not less than ().
A. 0.075mm coarse-grained group
B. 0.25mm coarse-grained group
C. 0.5mm coarse-grained group
D. 2mm coarse-grained group
Full marks: 2
8. the purpose of the settlement observation of the building is ()
A. verifies the correctness of engineering design and settlement calculation
B. to judge the quality of building construction
After the acci
您可能关注的文档
- 营销策划、顾问公司该有什么样的企业文化(What kind of enterprise culture should the marketing plan and consultant company have).doc
- 萨提亚家庭治疗模式(Satir family therapy model).doc
- 萨伏伊别墅综合评论(Villa Savoy reviews.).doc
- 萨克斯入门教材(Sax primer).doc
- 萨摩耶犬的性格和特点全面分析(A comprehensive analysis of the character and characteristics of Samoye's dog).doc
- 萨澳-丹佛斯sauer-danfoss液压马达和柱塞泵(Danfoss Danfoss Sauer-Danfoss hydraulic motors and piston pumps).doc
- 萨特自由观新探(New exploration of Sutter's view of freedom).doc
- 萨摩自制食谱(Satsuma homemade recipes).doc
- 营销高手的拜访客户之道(Marketing expert's way of visiting customers).doc
- 萧敬腾周渝民(2008-10-13 101149)(Jam Hsiao Zhou Yumin (2008-10-13 101149)).doc
原创力文档

文档评论(0)