路缘石、人行道方砖铺设(The edge of the road stone, brick paved sidewalks).docVIP

路缘石、人行道方砖铺设(The edge of the road stone, brick paved sidewalks).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路缘石、人行道方砖铺设(The edge of the road stone, brick paved sidewalks)

路缘石、人行道方砖铺设(The edge of the road stone, brick paved sidewalks) The edge of the road stone, pavement construction. On the edge of the road stone on the side of the lane, in accordance with the design of each 10m plane control mark in the resettlement curbs position, dug 5cm base, in order to pave M7.5 mortar, masonry stone road, in the plane control mark, M7.5 mortar masonry stone road, adjust the curbs on the top surface elevation. Curb the adjacent interval of 10m top line (note taut cord) Lagen, accordingly, the vacancy curbs placed first in the smooth surface, pointing at the wet sprinkler, then M10 mortar, Goufeng width less than 1cm, width of uniform, dense pointing. Quality requirements - Evaluation of kerb paving Kerbs laid flush with the road surface or drain neat, unimpeded pointing uniform, smooth and compact smooth straight lines, smooth curves no corner phenomenon, laying must be satisfied: straight degree error of 15mm, two adjacent elevation error of 3mm, two adjacent seam width allowable deviation + 3mm the top elevation of 10mm, the allowable deviation etc.. Construction of inlaid edge stone Prefabrication of A and inlaid stone The inlay stone is prefabricated by the specialized prefabricated plant, and the vehicle is transported to the site for installation. Lofting, installation and paving of B and inlaid stone In the block stone sidewalk side, according to the design of each 10m plane control mark block edge stone placement in the place, dug 5cm lime soil base, in order to pave M7.5 mortar, masonry block stone, in the plane control mark, block edge stone with M77.5 mortar, adjust the block edge stone top elevation in the interval of 10m block, adjacent edge stone top line (note taut cord) Lagen, accordingly, the vacancy of fringe stone surface smooth swing, pointing at first in the wet sprinkler then, M10 mortar, Goufeng width less than 1cm, width of uniform, dense pointing. C - quality requirements - Evaluation of inlaid stone Block edge stone la

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档