进料验收管理办法(Measures for the administration of incoming acceptance).docVIP

进料验收管理办法(Measures for the administration of incoming acceptance).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
进料验收管理办法(Measures for the administration of incoming acceptance)

进料验收管理办法(Measures for the administration of incoming acceptance) Measures for the administration of incoming acceptance First, the companys acceptance of materials and warehousing are operating in accordance with these measures. Second documents to be received The material management personnel in material purchasing department received a transfer to the approved purchase order, according to material suppliers, and the delivery date are sequentially arranged and stored in the database file, arrange to delivery before feeding operations in order to receive. Third strips of material (I) purchasing and receiving materials; 1. materials into the factory after receiving personnel must be in accordance with the purchase order content, and check the supplier from the material name, specifications, quantity and delivery orders and invoices and check the correct number, date of arrival and the number will be paid in the fill requisitions for receiving. 2. if found the materials sent and approved purchase order on the content of the discrepancies, you should immediately notify the purchaser, and notify the competent purchase order , non approved materials will not be accepted in principle, such as purchasing department take the material requirements when receiving personnel should inform supervisor. And indicate the actual receiving status in the document, and countersigned by the purchasing department. (two) purchased materials received 1. materials into the factory after receiving the materials management personnel in conjunction with the inspection unit in accordance with the packing list and purchase order open cabinet (box) to check the material name, specifications and inventory number, and date of arrival and received quantity to fill | purchase order. 2., after opening the cabinet (box), if found that the loading of materials and packing list or purchase list content recorded, notify the import and procurement department for processing. The 3. found the loading of the

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档