锅炉汽包吊装(Boiler drum hoisting).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
锅炉汽包吊装(Boiler drum hoisting)

锅炉汽包吊装(Boiler drum hoisting) (two) scheme analysis 1, translation scheme Scenario 1: Just above the use of rope hanging on the drum in advance temporary position, when the drum up to the highest point, the wire rope drum and temporary suspension lug connection, slowly descend winch, the temporary wire rope slowly using their own weight bearing, eventually swung to a position in the drum. The biggest advantage of this scheme is that there is no need to design temporary facilities to save costs, but accurate calculation of the length of the suspension rope, otherwise, the drum will not be in place smoothly. At the same time, because the drum in the process will produce tension to the entire boom beam, it is easy to cause the deformation of the boom beam, which will affect the installation quality of the drum after placing in place. Scenario two: Laying the slipway, designing and making small tanks to slide them on the slipway. When the drum is raised to a certain height, the chain pulley is used to pull forward the root of the fixed pulley, and the small tank and slideway are used to slide the drum into position. This scheme is more complicated than the scheme one, but its advantage lies in the steady process of the drum in place, the random adjustment of the drum position and the steady position of the drum. After discussion by the panel members, the final decision was made on programme two: laying the chute and using small tanks. Choose the scheme that the winch is arranged at the bottom of the furnace. (two) determine the best plan Through the above analysis, we have chosen to solve the drum tilt 40 degrees lifting and moving at a certain height 4 meters in place of the best program. The winch arranged in the bottom, put 200 tons of pulleys to install small tanks in the fixed pulley deep beams, a small tank chute arranged outside the drum boom beam, 40 degree tilt lifting in close to the H beam, the drum height more than 54 meters after leveling, by pulling a small

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档