- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
振动防堵器(Vibration anti blocking device)
振动防堵器(Vibration anti blocking device)
Application analysis of Shandong grand vibration anti blocking device
I plant began burning coal from the times in late April of this year, due to changes in coal, coal water is large, the original coal handling equipment has been unable to meet the needs of coal during low load operation, even if it has repeatedly been forced into short combustion oil. To this end we will be sent to the personnel of coal unloading coal operation help coal, so that each position increased to two people, even if the operator tired or exhausted phenomenon often appears dead. In order to solve the problem of blocking coal to Hebi Fenghe crane power plant, it is found that the design of vibration anti blocking device in Shandong Hongwei power equipment factory is reasonable. Therefore, we chose Shandong grand vibration anti blocking device.
In from August 4th to 15th, the Shandong grand coal mine carried out the first transformation of the coal handling A system, mainly on the following major coal plugging points were modified, respectively:
1. The anti blocking device is installed on the 3#A coal pipe at the tail of the belt. In the installation of anti clogging device before the site frequently blocked, and the coal falling pipe is not easy to clean up a long, long time blocking coal processing; after the transformation has changed, but the lower air lock due to the installation commissioning defects, the coal dropping pipe forming step coal are serious.
2. The falling coal pipe of the 3#A belt machine head two turns back below the three pass is changed into a special falling coal pipe which directly enters the roller screen, and a vibration anti blocking device is arranged on the special-shaped coal falling pipe. Before the transformation part of one of the main reasons for the 3#A belt conveyor head coal blockage; after transformation to solve the coal problem here is blocked, since the transformation after the operation here never happened coal
您可能关注的文档
- 扳手腕训练文档(Wrench wrist training document).doc
- 批处理的极限应用(Limit application of batch processing).doc
- 找回好睡眠(Get a good sleep).doc
- 找回还原精灵的密码的七种方法(Seven ways to retrieve the restore wizard's password).doc
- 找回丢失的windows 任务栏图标(Retrieve the missing windows taskbar icon).doc
- 找工作的五险一金你懂么(The job five social insurance and one housing fund you know).doc
- 找广告牌上的错别字大全(Find the billboard typos Daquan).doc
- 批处理bat文件实现各种功能(Batch bat file implements various functions).doc
- 找回删除的文件 __一不小心把文(Recover deleted files __ accidentally put a paper).doc
- 技击之神李书文(Li Shuwen, the God of martial arts).doc
文档评论(0)