接电系统(Power supply system)
接电系统(Power supply system)
(1) the basic mode of engineering power supply;
According to the various protection modes and terms defined by IEC, the low-voltage distribution system is divided into three kinds according to the grounding mode, namely, TT, TN and IT systems, as follows.
(1) TT mode power supply system TT means the direct protection system of the metal casing of the electrical equipment, called the protective earthing system, also known as the TT system. The first symbol T said that the neutral point of power system is directly connected to the ground; second T mark indicates that the load device is not connected with the charged body exposed metal conductive part is directly connected with the earth, and how the system grounding. In the TT system, all the ground of the load is called a protective ground, as shown in figure 1-1. The features of this power supply system are as follows.
1) when the metal casing of the electric equipment is charged (the phase line meets the shell or the equipment is damaged and the electricity is out of circulation), because of the earthing protection, the risk of electric shock can be greatly reduced. However, the low-voltage circuit breaker (automatic switch) does not necessarily trip, resulting in leakage of equipment of the earths surface voltage is higher than the safety voltage, belonging to the dangerous voltage.
2) when the leakage current is relatively small, even if the fuse does not necessarily fuse, so the leakage protector is needed for protection, so it is difficult to popularize the TT system.
3) TT system grounding device of steel consumption, and difficult recovery, labor and material costs.
Now some construction units are using TT system, construction units borrow their power for temporary use of electricity, the application of a special protective line, in order to reduce the need for grounding equipment steel consumption.
Separate the special protection line of the newly added PE line and zero line N work,
您可能关注的文档
- 扳手腕训练文档(Wrench wrist training document).doc
- 批处理的极限应用(Limit application of batch processing).doc
- 找回好睡眠(Get a good sleep).doc
- 找回还原精灵的密码的七种方法(Seven ways to retrieve the restore wizard's password).doc
- 找回丢失的windows 任务栏图标(Retrieve the missing windows taskbar icon).doc
- 找工作的五险一金你懂么(The job five social insurance and one housing fund you know).doc
- 找广告牌上的错别字大全(Find the billboard typos Daquan).doc
- 批处理bat文件实现各种功能(Batch bat file implements various functions).doc
- 找回删除的文件 __一不小心把文(Recover deleted files __ accidentally put a paper).doc
- 技击之神李书文(Li Shuwen, the God of martial arts).doc
最近下载
- DLT-612-2017-电力行业锅炉压力容器安全监督规程.pdf
- 北师大版九年级数学下册教案(完整版)全册教学设计.doc
- 2023-2024学年下学期《形势与政策》学习通超星期末考试答案章节答案2024年.docx
- 2021至2022学年上学期中学化学沪教版期中考题之电解水实验(有答案与解析).pdf
- 龙王池尾矿库回采和利用项目(闪星锑业公司)环境影响报告.pdf
- 山东玻纤:首次公开发行股票招股说明书摘要.docx
- 东风本田-享域(ENVIX)-产品使用说明书-享域(ENVIX)乐享版-DHW7103FSCSF-享域(ENVIX)用户手册(2019款).pdf
- 江苏-南京市 2023-2024学年六年级英语上学期期末真题汇编卷 (含答案解析).docx VIP
- 2024年软件资格考试软件设计师(中级)(基础知识、应用技术)合卷试题及解答参考.docx VIP
- 急性心肌梗死合并心原性休克诊断和治疗专家共识(2021版)解读.pptx
文档评论(0)