汽轮机试运行(Steam turbine test run).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
汽轮机试运行(Steam turbine test run)

汽轮机试运行(Steam turbine test run) Complete start-up and commissioning of steam turbine The whole set of start-up and commissioning of turbo generator sets is the final test of equipment before being put into production, and it is also a comprehensive appraisal of equipment and installation quality. 1. test run and steam pipe flushing 1.1 water pump section commissioning and plumbing system flushing 1.1.1 rotating machinery segment trial run After the 1.1.1.1 equipment is installed, the motor is tested on an empty load. After determining the direction of rotation, the test should be switched from 1 to 2H. When the equipment vibration and bearing temperature rise are normal, stop, turn the motor and pump body alignment, and then connect the coupling bolts. 1.1.1.2 water pump and other rotating machinery division before the trial, the first test of the system concerned, only after the test pressure qualified, the system must be tested flushing. 1.1.1.3 water quality requirements and higher precision rotating machinery, such as various types of pumps, their entrance should be equipped with filters, in order to prevent debris access to damage equipment. Before the 1.1.1.4 test, the bearings of the rotating machinery should be cleaned up, and the qualified lubricating oil or grease will be added, and the rotor will be driven. Only after confirming that everything is normal shall we start the rotating machinery. 1.1.1.5 pump or other rotating machinery, according to the provisions of load trial operation, the general provisions of not less than 4 ~ 8h, in response to the trial operation of bearing vibration and oil temperature rise, pump entrance pressure and motor current and temperature monitoring and recording. Only when the above record conforms to the technical requirements can the branch be proved to be qualified. 1.1.1.6 according to the design requirements to do the protection and linkage test, should achieve the design of technical indicators. Flushing of 1.1.2 water

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档